background image

UG-192 

Evaluation Board User Guide

 

Rev. 0 | Page 2 of 8 

TABLE OF CONTENTS 

Package Contents.............................................................................. 1

 

Other Supporting Documentation................................................. 1

 

General Description ......................................................................... 1

 

Evaluation Board Overview ............................................................ 1

 

Revision History ............................................................................... 2

 

Setting Up the Evaluation Board .................................................... 3

 

Input Configuration ..................................................................... 3

 

Operation Mode Configuration ................................................. 3

 

Output Configuration...................................................................3

 

Power Supply Configuration .......................................................3

 

Component Selection ...................................................................3

 

Getting Started...............................................................................4

 

What to Test ...................................................................................4

 

Evaluation Board Schematic and Artwork.....................................5

 

Ordering Information.......................................................................8

 

Bill of Materials..............................................................................8

 

 

REVISION HISTORY 

10/10—Revision 0: Initial Version 

 

Downloaded from

Arrow.com.

Downloaded from

Arrow.com.

Summary of Contents for SSM2317-EVALZ

Page 1: ...vel control ALC can be activated to suppress clipping and improve dynamic range This feature only requires one external resistor tied to GND via the VTH pin and an activation voltage on the ALC_EN pin...

Page 2: ...ory 2 Setting Up the Evaluation Board 3 Input Configuration 3 Operation Mode Configuration 3 Output Configuration 3 Power Supply Configuration 3 Component Selection 3 Getting Started 4 What to Test 4...

Page 3: ...device For optimal performance as specified in the SSM2317 data sheet in particular for THD and SNR remove the entire EMI filter short across the ferrite bead terminals and open the capacitor terminal...

Page 4: ...her the inductance is the lower the EMI becomes at the output However the cost and power consumption by the inductors are higher Using 0 47 H to 2 2 H inductors is recommended and the current rating n...

Page 5: ...1C ALC_EN 2B IN 1B IN 1A SD 2A VTH 3A OUT 3B OUT 3C VDD 2C C1 0 1 F C4 0 1 F L2 B0603 J4 HDR1X2 J3 HDR1X2 TP2 L1 B0603 J2 CON6A 1 2 3 4 5 6 C2 0 1 F C7 1nF R2 0 TP1 C5 0 1 F R4 100k C6 1nF 09354 003...

Page 6: ...r with Top Silkscreen 09354 005 Figure 5 Top Silkscreen 09354 006 Figure 6 Top Layer 09354 006 Figure 7 Layer 2 Ground Plane Downloaded from Arrow com Downloaded from Arrow com Downloaded from Arrow c...

Page 7: ...09354 008 Figure 8 Layer 3 Power Plane 09354 009 Figure 9 Bottom Layer Downloaded from Arrow com Downloaded from Arrow com Downloaded from Arrow com Downloaded from Arrow com Downloaded from Arrow com...

Page 8: ...he Evaluation Board are reserved by ADI CONFIDENTIALITY This Agreement and the Evaluation Board shall all be considered the confidential and proprietary information of ADI Customer may not disclose or...

Reviews: