EVAL-ADG5404FEBZ User Guide
UG-790
Rev. A | Page 3 of 10
GETTING STARTED
EVALUATION BOARD SETUP PROCEDURE
The
board operates independently and
does not require any additional evaluation boards or software.
An on-board LDO regulator provides digital control and the
supply voltage.
Supply the evaluation board with a dual power source of up to
±22 V or a single supply of up to 44 V. For single-supply operation,
connect VSS to GND using J3.
Set up a functionality test as follows:
•
Connect a power supply to J3. For single-supply operation,
connect VSS to GND using J3.
•
Insert a header at LK6 to use the on-board LDO regulator,
and set the header at LK5 to Position B.
•
LK2 through LK4 control the digital signals for each switch
on the
•
When these three links are in Position A, the switches
are open (off).
•
When these three links are in Position B, the S4 switch
is closed (on), and it has a resistance of approximately
10 Ω.
•
When LK9 is in Position A, LED1 lights up to indicate that
no faults were detected at any of the source pins.
EN
S1
V
SS
V
DD
GND
D
ADG5404F
ADP7142
FF
S4
J1:S1
J2:D1
J1:S4
LED1
GND
VSS
DC_V1
VDD
J3
J3
LK6
LK5
LK3
LK2
LK7
LK8
A
B
A
B
SF
FAULT DETECTION
+
SWITCH DRIVER
LK4
A
B
A
B
A0/F0
A1/F1
LK9
A
B
LK5
LK5
DR
LK1
B
A
12894-
002
Figure 2.
Block Diagram