background image

Jan 2021 Revision 

2755 Bankers Industrial Dr. 
Atlanta, GA 30360 
Phone: 770-448-6650 

Fax: 770-448-8970 

 

Battery Service Instruction Guide: 

 
 

A regular maintenance check of battery health and service serves to minimize the frequency of emergency 
maintenance events on the sign. American Signal Company recommends that when the sign is retrieved that the 
sign is serviced in a well-lit and well-ventilated area at a temperature between 60⁰F and 80⁰F. Before continuing 
any service, please use proper PPE for battery maintenance including acid resistant rubber gloves, apron, and safety 
glasses.  

 

Disconnect the battery pack from the sign using the battery switch.  

 

Clean the top of each battery with a mildly alkaline solution. Baking soda or soda ash mixed with water are 
preferred.   

 

Remove any residue with clean water. 

 

Ensure terminals are clean and that all terminal nuts are tightened to 100 in-lbs. 

 

Open the battery caps and ensure that the plates are submerged in acid. If the plates are not submerged add 
distilled water only until the plates are covered. Additional filling can result in the batteries boiling over 
during equalization. 

 

Close the battery caps.  

 

Charge the battery to full capacity.  

 

Open the caps on the battery.  

 

Add distilled water until the electrolyte level is ~1/4” from the bottom of the vent well. Over filling can 
result in the batteries boiling over during equalization. 

 

Close the battery caps.  

 

If any water was added or it has been over 1 month since the last equalization, perform an equalization on 
the batteries. 

o

 

Equalization voltage: 15.2V 

o

 

Duration: 3hrs minimum  

 

Open the battery caps 

 

Test the specific gravity with a hydrometer. A successful equalization will result in a specific gravity 
>1.265 in each cell with a variance between the cells less than +/-0.015. 

 

Close the battery caps.  

 

Reconnect the battery pack to the circuit using the battery switch. 

For further information and in-depth instructions or service kit availability please contact your American Signal 
Company representative or our partners at US Battery. US Battery has a wonderful website that explains the above 
procedure in both written and video format. Just go to USbattery.com 
 
American Signal Company   

 

 

 

US Battery 

www.amsig.com  

 

 

 

 

 

www.usbattery.com 

770-448-6650  

 

 

 

 

 

US Battery MFG. California 

2755 Bankers Ind. Drive, Atlanta GA 30360  

 

1675 Sampson Ave. Corona, CA 92879 

 

 

 

 

 

 

 

 

(800) 695 - 0945 

 

Summary of Contents for Portable Changeable Message Sign

Page 1: ...Information for Message Display Passwords Settings Web Training via YouTube Page 2 How to set up a Sequence of Messages using the Handheld Controller Page 3 Solar Panel Assembly Quick Recharge of Battery description Page 4 Message Sign Maintenance Checklist and Storage Information Web Training via YouTube Page 5 Battery Maintenance Full Instruction Manufacturer Instruction ...

Page 2: ...ed then the message is automatically saved in the next available CHANGEABLE message slot and ACTIVATED on the sign Press the BLANK switch inside the control cabinet to display the activated message Note The message will be formatted according to the default message settings font size alignment on off time etc The default message settings can be changed in the ADMIN menu Individual message settings...

Page 3: ...ing each message From the Messages menu scrollto Sequences select ENTER and press Ent er In the Sequences menu select ADD and press Enter Scroll and select desired message and press Enter Repeat this step until alldesired messages have been selected Added Sequences will be stored as new changeable messages Once completed return to home screen then select messages and press Enter Select Changeable ...

Page 4: ...length duration of message displayed the brightness level the number of Solar Panels the amount of available sunlight the number of Batteries the age of the Batteries and the ambient temperature voltage level of the Battery pack can eventually drop below 11 2VDC Default and the VMS will stop operating At that time or sooner if desired it will be necessary to recharge the Batteries with 120VAC from...

Page 5: ...age for longer than a month take the following measures to insure optimal battery and sign performance 1 Blank the sign display 2 On a full battery charge leave the sign unused for 30 days 3 Use the AC adapter to charge the batteries for 2 days 4 Repeat the 30 2 cycle for the duration of storage Letting the batteries die for an extended period of time may prevent them from holding a charge again I...

Page 6: ... in the batteries boiling over during equalization Close the battery caps Charge the battery to full capacity Open the caps on the battery Add distilled water until the electrolyte level is 1 4 from the bottom of the vent well Over filling can result in the batteries boiling over during equalization Close the battery caps If any water was added or it has been over 1 month since the last equalizati...

Reviews: