4-1
Installation Checklist
Uncrating/Installation Instructions
P-920012-041
Installation checklist must be completed after the unit is installed
and prior to performing the operational test to assure complete and
correct installation.
NOTE: Contact your STERIS representative to schedule a techni-
cian to test your installation and demonstrate proper equipment
operation.
❏
Shutoff valves (not by STERIS), for maintenance purposes and
capable of being locked in OFF position only, installed on steam,
air, and water lines and in compliance with local occupational
health and safety regulations, as well as electric and plumbing
codes for any special requirements that may pertain to installa-
tion of this unit.
❏
Disconnect switches (not by STERIS), capable of being locked in
OFF position only, installed in electrical supply lines near the unit
and in compliance with local occupational health and safety
regulations, as well as electric and plumbing codes for any
special requirements that may pertain to installation of this unit.
NOTE: If unit is installed next to other equipment, shutoff valves and
disconnect switches should be located so that service can be shut
off to one piece of equipment at a time.
❏
Unit positioned, as shown on Equipment Drawing, with required
clearance space and in relation to building supply lines.
❏
Unit is level. Use leveling legs if necessary.
❏
Building cold water line supplies water to unit as specified on
Equipment Drawing.
❏
Building hot water line supplies water to unit as specified on
Equipment Drawing.
❏
Building steam line provides steam to unit as specified on
Equipment Drawing (required on Steam-Heated units only).
❏
Building condensate return line is connected to unit as specified
on Equipment Drawing (required on Steam-Heated units only).
❏
Pure water line supplies water to unit as specified on Equipment
Drawing.
❏
Building air line supplies air to unit as specified on Equipment
Drawing.
❏
Building waste line is connected to unit as specified on Equip-
ment Drawing.
❏
Building ventilation system is connected to unit as specified on
Equipment Drawing.
❏
Electrical supply for unit is as specified on Equipment Drawing.
❏
Pressure for air, water, and steam supplies is within range
specified on Equipment Drawing.
INSTALLATION CHECKLIST
4