![AMQ MONITOR ARM Installation Manual Download Page 3](http://html1.mh-extra.com/html/amq/monitor-arm/monitor-arm_installation-manual_2935840003.webp)
MONITOR ARM
INSTALLATION GUIDE | 3
amqsolutions.com
Step 1
Preparations before installing monitor:
1. Make sure there are 100x100mm or 75x75mm VESA holes in the monitor.
If not, the mount can’t be installed.
2. Remove the original fixed base of monitor, taking care not to scratch the screen.
INSTALLATION