Phase 1
Foot and Base Plate Assembly
ILINE
90°/180° (4-Way) Post
Installation Guide
Completed Foot Plate
6
6
Place each foot assembly down based on
the pre-established design configuration.
*
PLATE DIRECTION:
When setting the plates
down, make sure the open
cutouts of the plates and
cutouts of the posts are
aligned and facing in the
same direction as the spine.
*
20
Please contact
if you are missing any parts, have difficulty with assembly, or have any product related questions.