background image

ILINE 

power/data beam

Installation Guide

Summary of Contents for ILINE

Page 1: ...ILINE power data beam Installation Guide...

Page 2: ...the Configuration 16 90o 180o 4 Way ILINE Post Assembly Components 18 Foot and Base Plate Assembly 19 20 Beam Assembly 21 22 Post Beam and Base Feed 23 Jumpers 24 Caps and Covers 25 Post Sleeve 26 Sc...

Page 3: ...ILINE installation guide 180 2 WAY...

Page 4: ...iLine 180 Post x 1 Nuts x 4 Feet Assembly x 1 Side Plastic Cover x 1 Top Cap x 1 ILINE 180o 2 Way Post Installation Guide 4 Please contact cc amqsolutions com if you are missing any parts have diffic...

Page 5: ...own based on the pre established design configuration PLATE DIRECTION When setting the plates down make sure the open cutouts of the plates and cutouts of the posts are aligned and facing in the same...

Page 6: ...rough the desired end of the beam and into the adjacent post opening Continue to feed the power entry until the exposed end is out through one of the base plate s openings Secure the post to the foote...

Page 7: ...embly Connect the jumper to each junction block Repeat Steps 1 3 until the last jumper is connected the last junction block The remaining installation of electrical must be installed by a professional...

Page 8: ...snap them onto each end of the underside of the beam assembly Snap on data face plates Insert the bottom beam plates between each data adapter on the underside of the beam assembly Repeat Steps 1 4 fo...

Page 9: ...tion until leveled NOTE Use a leveling guide for accuracy You may adjust height of each post by rotating the base plates in order to level all horizontal beams 2 Completed ILINE 1 ILINE 180o 2 Way Pos...

Page 10: ...ILINE installation guide 120 3 WAY...

Page 11: ...n Guide Components Top cap 120degree vertical post Base plate Glide OEM Post Side Cover Hex Nuts 11 Please contact cc amqsolutions com if you are missing any parts have difficulty with assembly or hav...

Page 12: ...ay Post Installation Guide 1 Refer to Phases 1 and 2 on pages 4 7 For receptacle installation see pages 21 22 12 Please contact cc amqsolutions com if you are missing any parts have difficulty with as...

Page 13: ...ts in the center of vertical post Fasten the beams using two screws on each end Use 1 4 20 hex nut to tight down posts on the footer assemblies 7 16 Spanner ILINE 120 3 Way Post Installation Guide 13...

Page 14: ...the power entry plug to the junction block NOTE Depending on the floor plan you may access the base feed through any of the posts in the assembly 1 2 ILINE 120 3 Way Post Installation Guide 14 Please...

Page 15: ...post Snap on data face plates onto each end of the beam assemblies Insert the bottom beam plate between each data adapter on the underside of the beam assembly 1 2 4 3 ILINE 120 3 Way Post Installatio...

Page 16: ...assembly Feed the jumper through the beam canal and into the vertical post opening into the next beam assembly Connect the jumper to each junction block Re attach the top cover onto the vertical post...

Page 17: ...ILINE installation guide 90 180 4 WAY...

Page 18: ...tom Beam Plate Wire Tray Top Cap Vertical Post Post Side Covers Hex Nuts Base Plate Kit Foot SRE Foot SRC Foot DRE Foot DRC Post Sleeve Data Face Plate Components ILINE 90 180 4 Way Post Installation...

Page 19: ...plate Screw the bolts into the coupling nuts until the bolt tips are revealed Screw the foot assembly to the foot plate nuts Repeat Steps 1 4 for the all foot and base plates 3 4 5 4 x 3 Bolt 5 16 x...

Page 20: ...the pre established design configuration PLATE DIRECTION When setting the plates down make sure the open cutouts of the plates and cutouts of the posts are aligned and facing in the same direction as...

Page 21: ...junction block until the receptacles are evenly protruding out on both sides of the beam Drop in the offset bracket on each end of the junction block as shown in diagram Use the 4 screws provided to m...

Page 22: ...tled like in the diagram Lower the junction block into the beam canal like shown in the diagram A little force is needed to push the junction block into position Make sure the recepacles sticks out fr...

Page 23: ...through the desired end of the beam and into the adjacent post opening Continue to feed the power entry until the exposed end is out through one of the base plate s openings Secure the post to the fo...

Page 24: ...the jumper to each junction block Repeat Steps 1 3 until the last jumper is connected the last junction block The remaining installation of electrical must be installed by a professional electrician S...

Page 25: ...nto each end of the underside of the beam assembly Snap on data face plates Insert the bottom beam plates between each data adapter on the underside of the beam assembly Repeat Steps 1 4 for all beam...

Page 26: ...cut portion for the base feed access and line up with post Align the Post Sleeve on both sides and apply pressure until pieces snap into place Installed Post Sleeve NOTE After installing electrical l...

Page 27: ...ce Repeat Steps 1 4 for each screen 3 4 5 NOTE Pre measuring each clip s distance from the beam ends before attaching will ensure a centered and balanced appearance to the installed screen Suggested d...

Page 28: ...h corner s elevation until leveled NOTE Use a leveling guide for accuracy 1 Adjust height of each coupling nuts to level the base plate of each post 2 Horizontal alignment Vertical alignment Completed...

Page 29: ...the sealing trim 1 2 1 3 2 4 5 Mount the adapter bracket to power pole using two machine screws and two self tappers Insert Power Pole with adapter bracket into the slot opening in the side of the ve...

Page 30: ...764 Walsh Avenue Santa Clara CA 95050 877 801 0370 amqsolutions com 5 Day Open Plan we provide exceptional experiences with reliable easy interactions and successfully fulfilled orders in only 5 days...

Reviews: