INSTALLATION & MAINTENANCE GUIDE
–6–
w w w. a m p l i g h t i n g . c o m
–6–
AMP
®
PillarPro LED Post-Top Light
APL-3019-4-B-BZ
OPTION B: MOUNT TO A 4X4 Post
1
Remove Top from Base
Using a screwdriver, unscew the screws
on the side of the base and remove the
top from the base.
Screw
Remove
Top
Base
2
Install Base to 4x4
Attach the base onto a 4” x 4” square
wood post and secure with the
self-tapping screws. Hand tighten
with a screwdriver.
Self-tapping
Screw
WOOD POST
Base