background image

Picture!3A!

Picture!3B!

Picture!3C!

Picture!3D!

Picture!3E!

8(pcs.(10(mm(bolts(

(length(30(mm)(

8(pcs.(10(mm(flat(locknuts(

8(pcs.(washers(

20(pcs.(10(mm(bolts((length(

18(mm)(and((4(pcs.(10(mm(

bolts((length(30(mm)(

24(pcs.(10(mm(round(nuts(

24(pcs.(washers(

The(front(and(back(panels(are(mounted((see(picture(3F).(

The(side(panels(are(mounted((see(picture(3G).(The(four(canopy(holders(are(mounted(with(the(long(bolts(

in(the(holes(in(the(middle((see(pictures(below)(

The(base(panel(is(mounted((see(picture(3H)(

Picture!3F!

Picture!3G!

Picture!3H!

2(pcs.(10(mm(bolts(

(length(70(mm)(

2(pcs.(10(mm(flat(locknuts(

2(pcs.(washers(

Page(4(

4(pcs.(canopy(holders(

Summary of Contents for Electric Cargo Bike

Page 1: ...sembled and it is important to read the manual carefully before star5ng assembly so the bicycle will be assembled in the correct order It is recommended to be two people to assemble the cargo bike Be...

Page 2: ...e Do not 5ghten the nut yet With the 7 large bolts washers and nuts mount the bowEshaped and the two straight metal rods as shown on image 1D 1E 1F and 1G The metal rods must be placed below the traze...

Page 3: ...s as shown in the picture 2C and 2D Loosen the four brake pads on the front wheels and adjust them so they are properly placed visEaEvis the rim picture 2E Finally the chair is removed and the bike is...

Page 4: ...0 mm round nuts 24 pcs washers The front and back panels are mounted see picture 3F The side panels are mounted see picture 3G The four canopy holders are mounted with the long bolts in the holes in t...

Page 5: ...ght is mounted see picture 4E and 4F 4 pcs 10 mm bolts length 18 mm 4 pcs 10 mm locknuts 4 pcs washers 2 pcs stepEboards Step 4 The rest of the equipment 4 pcs side re ectors 2 pcs front re ectors Pic...

Page 6: ...utside of the box frontE and back panel and below the child seat see picture 4J 4K 4L and 4M The pedals are mounted see picture 4N and 4O 4 pcs 10 mm bolts length 35 mm 4 pcs 10 mm round nuts 4 pcs wa...

Page 7: ...e break handles gear shiFer display and bell are mounted on the handlebar see picture 4R The brake cables are pulled through the handlebar to the leF see picture 5A The brake cables for the front brea...

Page 8: ...sure that there is a couple of mm movement exibility and then 5ghten the umbraco screw Ensure that the break pads do not touch the rim on both sides when the wheel is turned Follow the same procedure...

Reviews: