AML Oceanographic PDC-DCC-05 Quick Start Manual Download Page 2

 

Figure 5 – 

Top: 

Cabled UV connected to the Duty Cycle Controller. 

Bottom:

 timing board enclosed in DCC housing. 

 

Figure 6 – Confirm proper UV module alignment with standard white paper 

 

3.

 

Set duty cycle:

 If you are using AML’s Duty Cycle Controller (PDC-DCC-05), plug Cabled UV into the 

DCC’s female connector after setting the duty cycle.  Duty cycle is controlled by 60 DIP switches located on 

the timing board enclosed in the DCC. Each switch represents two minutes, where up is on and down is off. 
Detailed instructions on setting the DCC’s duty cycle are available in the Duty Cycle Controller quick start 
guide and user manual.  

 
 

 

 

 

 

 

 

 

 

 

 

 

 

    

4.

 

Power  the  device  and  check  operation:

  Provide 

12-26  VDC

  to  Cabled  UV  to  confirm  operation  and 

module  orientation.  Standard  white  paper  will  fluoresce  a  bright blue/purple  when  exposed to  UV  light. 
Confirm that the target surface will be protected by placing paper on the target surface after powering Cabled 

UV. A pin-out wiring diagram for Cabled UV is on page 3 of 

Cabled UV Biofouling Control – Customer 

Overview Drawing

 at the end of the Cabled UV Biofouling Control user manual.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

5.

 

Deploy the device: 

Deploy Cabled UV up to a maximum depth of 

500 m [1640 ft.].

  

 

White printer paper 

 

Duty Cycle Controller   

and mounting assembly 

First DIP Switch 

MCIL6M 

Male 6 pin connector 

Fluoresced pattern 

(protected area) 

 

Timing order 

Reviews: