www.amico.com
5
Installation
3. Using a stud locator, mark the location of any metal studs in the building wall that intersect the
headwall mounting location.
stud
drywall
stud reference line
wall
finished floor
4. Mount the bracket(s) on the wall using hardware compliant to local building codes (supplied
by others). Align bracket(s) horizontally according to headwall mounting location. Refer to
drawings. Bracket includes I.D. marks for locating holes vertically, which are to be drilled on-site
according to location of studs. Remember to align bottom of bracket to “bottom of bracket” line
marked in step “2”.
bottom of
mounting
bracket line
bottom of mounting
bracket lines
bracket
I.D. mark for holes