background image

  E c o n o m y   M a n i f o l d  

P a g e :   4  

INTRODUCTION

The Amico Economy Medical Gas Manifold incorporates the basic necessities for the distribution and 

monitoring of medical gases.  The manifold has been designed to provide user flexibility and reliability. 

This manual will enable the customer to install, use and maintain the manifold properly. 

The  total amount of medical gas contained in the left or right banks is displayed on the analog gauges 

on either side of the manifold.  These gauges are provided to show the cylinder bank pressure in use 

and the cylinder bank pressure in reserve at all times. 

When the gas cylinder pressure depletes on the “In Use” (primary) side below the set point of the 

pressure switch, a signal will go to the master alarm (or remote buzzer) informing the hospital 

personnel that the “In Use cylinder bank pressure is low and the cylinders need replacement.   At this 

point someone has to silence the alarm (or buzzer) and manually switch the “In Use” side to 

“Reserve” and the “Reserve” side to “In Use”.  To do this, simply turn the preset, clearly labelled 

handles on the operating (lower) regulators.  Then proceed to change the cylinders.  Changing the 

settings of the operating regulators will also reset the pressure switch and cancel the alarm condition. 

*NOTE:  Always change the regulator settings BEFORE changing the empty cylinders. 

FEATURES INCLUDE:

„



„

„

„

„

Preset operating regulators for easy switch over 

„

Single or Dual line regulators 

„

CGA gas specified header bar with integral check valves and cylinder pigtail assemblies. 

„

High pressure header isolation valves. 

„

Manifold complies with NFPA-99.  (Dual Line Only)

lines to outside facility. 

Summary of Contents for ALERT- 2

Page 1: ...ECONOMY MANIFOLD ALERT 2 Installation and Maintenance Manual v1 5...

Page 2: ...G ALARM SYSTEMS 7 SAFETY FEATURES 7 INSTALLATION8 RECEIPT AND LOCATION 7 ASSEMBLY INSTRUCTIONS 7 TESTING FOR LEAKAGE 9 FINAL TESTING 10 NORMAL OPERATING PROCEDURE 10 MAINTENANCE 11 GENERAL 11 CYLINDER...

Page 3: ...are broken missing worn distorted or contaminated must be replaced immediately Should such repair or replacement become neces sary please contact Amico Corporation or their distributors All manifolds...

Page 4: ...he master alarm or remote buzzer informing the hospital personnel that the In Use cylinder bank pressure is low and the cylinders need replacement At this point someone has to silence the alarm or buz...

Page 5: ...mpressed Medical Air and Carbon Dioxide service the In Use regulator will be set at 200 psi and the Reserve regulator will be set at 120 psi For Nitrogen the In Use regulator will be set at 250 psi an...

Page 6: ...tem Without Reserve Supply as classified in NFPA 99 Clause 4 3 1 5 This is one category of the broader classification Central Supply System which encompasses many types of sources of supply to nonflam...

Page 7: ...cabinet door The two pipes extending from the top of the manifold one for line pressure relief and one for the operating pressure relief are labelled Cylinder Connections The Amico manifold is design...

Page 8: ...boltssuppliedaspartoftheassemblies Removetheplugandchainassemblyoneachoutletconnectiononthecylinderextensionbar Attach the cylinder pigtails to the header bar connections while ensuring the check val...

Page 9: ...nder extensionbarusingthecopperorstainlesssteelcylinderconnectionhoseassemblies pigtails supplied 2 Make sure all other outlets are capped with the plug and chain assemblies supplied 3 Make sure that...

Page 10: ...ng at least one full minute allow time for the dissipation of generated heat S L O W L Y open all the rest of the cylinder valves one at a time The bank that was pressurized first will become the prim...

Page 11: ...nd Valves A Inspect semiannually and test for external leakage and tightness of shut off CYLINDER EXTENSION BARS The following components shall be inspected semiannually as indicated 1 Test check valv...

Page 12: ...ssure Regulator Faults Gas leakage around oper ating pressure regulator bodycap Venting at intermediate relief valve Pipeline not at desired pressure Required gas flow not available Low pressure relie...

Page 13: ...OPEN THE CYLINDER VALVE ON THE CYLINDER CLOSEST TO THE CONTROL CABINET WATCH THE BANK PRESSURE DISPLAY ON THE FRONT OF THE CABINET TO MAKE SURE THE PRESSURE RISES SLOWLY TO THE FULL CYLINDER PRESSURE...

Page 14: ...rogen NIT Header bars are sold separately M2 HBSG 04U GAS HBSG Staggard header bar or HBST Straight header bar 04 represents the number of cylinders 2 2 U represents language and color code U NFPA USA...

Page 15: ...ug Chain assembly Nit M X HB NUT NIT Plug Chain assembly Oxy M X MAN 36 Copper pigtail c w Check valve M X HB PTC AIR Air Copper pigtail c w Check valve M X HB PTC CO2 CO2 Copper pigtail c w Check val...

Page 16: ...E c o n o m y M a n i f o l d P a g e 1 6 APPENDIX A Economy Manifold Layout...

Page 17: ...A l e r t 2 S e r i e s P a g e 1 7 APPENDIX B Piping Schematic Diagram NFPA...

Page 18: ...Not supplied by Amico Hole size to be determined by the customer Recommended distance 57 from floor to center of bottom hole 14 50 15 00 14 50 381 mm Recommended distance 57 1448 mm from floor to cent...

Page 19: ...14MadisonRd Fairfield NJ07004USA Tel 1 877 GOAMICO 1 877 462 6426 85FultonWay RichmondHill ONL4B2N4Canada Fax 905 764 0862www amico com AUG 04 M2 MANUAL ECO...

Reviews: