14
2. The cable pass through the cross beam to top plate of columns and be screwed with
cable nuts.
Installation for Cable limit Pin on cross beam
(See Fig. 22).
Fig. 22
Cable pass through
between the big pulley
and tension pulley
Cable pass through top
plate and be screwed
with cable nuts.
7
Cable Limit Pin
Cable
Pulley
47
48