Installation Guide | 3-19
Wiring
Remove AC mains power from the controller before performing wiring.
Connections to the sensor unit are made through the wiring card. The
wiring card is located on the front-bottom of the sensor unit.
Any screw terminals on the wiring card not described in this section
are reserved for future use.
This wiring section shows you how to make the following connections:
• AC mains supply wiring to WDG-V sensor
• WDG-V unit to remote calibration unit
• WDG-V unit to alarm devices
• WDG-V unit to current output devices
• WDG-V unit to AMEVision Display User Interface (RS-485 communi-
cations)
• AC mains supply wiring to AMEVision Display User Interface
In addition, this wiring section provides mandatory EMC grounding,
shielding, and noise protection requirements.
General Wiring and Conduit Requirements
This section describes general wiring and conduit requirements.
• Sensor wiring conductors must be rated at a minimum of 80 °C. All
other wiring conductor ratings should be for the minimum tempera-
ture required for the equipment being connected to the analyzer, but
not less than 60 °C.
• Use only the applicable NEMA-approved conduit fittings or cable fit-
tings to maintain the NEMA rating for the sensor enclosure or WDG-V.
If not using a conduit entry, leave the factory NEMA-approved plugs
intact. Never leave any holes unplugged.
NOTE
Summary of Contents for Thermox WDG-V
Page 8: ...viii Thermox WDG V VC VCM with Blow Back This page intentionally left blank...
Page 16: ...xvi Thermox WDG V VC VCM with Blow Back This page intentionally left blank...
Page 22: ...1 6 Thermox WDG V VC VCM with Blow Back This page intentionally left blank...
Page 34: ...2 12 Thermox WDG V VC VCM with Blow Back This page intentionally left blank...
Page 57: ...Installation Guide 3 17 Figure 3 18 RCU flow diagram 3 Span Combustibles and Methane...
Page 58: ...3 18 Thermox WDG V VC VCM with Blow Back This page intentionally left blank...
Page 64: ...3 24 Thermox WDG V VC VCM with Blow Back Figure 3 20 Wiring...
Page 73: ...AMEVision Display User Interface or Communications 4 5...
Page 76: ...4 8 Thermox WDG V VC VCM with Blow Back This page intentionally left blank...
Page 88: ...5 12 Thermox WDG V VC VCM with Blow Back This page intentionally left blank...
Page 91: ...Service and Parts 6 3 Figure 8 1a Wiring diagram for sensor...
Page 96: ...6 8 Thermox WDG V VC VCM with Blow Back Figure 8 3 Thermocouple replacement...
Page 100: ...6 12 Thermox WDG V VC VCM with Blow Back Figure 8 5 Flow sensor replacement...
Page 103: ...Service and Parts 6 15 Figure 8 7 Box Heater Replacement...
Page 105: ...Service and Parts 6 17 Figure 8 8 Combustible Block Heater Replacement...
Page 107: ...Service and Parts 6 19 Figure 8 9 Electronics Board Removal...
Page 114: ...7 4 Thermox WDG V VC VCM with Blow Back This page intentionally left blank...
Page 118: ...A 4 Thermox WDG V Series Analyzers This page intentionally left blank...
Page 126: ...A 12 Thermox WDG V Series Analyzers This page intentionally left blank...
Page 132: ...A 18 Thermox WDG V Series Analyzers This page intentionally left blank...
Page 137: ...PC Configurator Software A 23 Figure 23 Calibration_Calibration Results screen...
Page 138: ...A 24 Thermox WDG V Series Analyzers This page intentionally left blank...
Page 144: ...A 30 Thermox WDG V Series Analyzers This page intentionally left blank...
Page 156: ...A 42 Thermox WDG V Series Analyzers This page intentionally left blank...
Page 164: ...A 8 Thermox WDG V VC VCM with Blow Back This page intentionally left blank...