Installation Guide | 3-13
Calibration Gas Connection
A calibration gas inlet port is provided to allow you to calibrate the system
as shown in Figure 3-8. During calibration, you turn off the aspirator air
supply and inject your calibration gases into the calibration gas inlet port
on the sensor. During normal operations, the calibration gas inlet port
should be plugged.
Remote Calibration Unit Mechanical Installation
Remote calibration unit (RCU) mechanical installation includes the follow-
ing:
• Mounting the RCU.
• Plumbing calibration gases to the RCU.
• Plumbing the RCU to the sensor.
This section is divided into instructions for standard RCU and combus-
tibles RCU mechanical installation. Go to the section that applies to the
type of RCU you purchased.
Do not turn on the aspirator until the sensor has been turned on
and is hot - preferably 24 hours. Also, if you turn off the analyzer or
the process is shut down, turn off the aspirator air to avoid plugging
problems!
Standard RCU Mechanical Installation
Figure 3-9 shows mounting dimensions for a standard RCU. Use two #10
screws to mount the RCU. Note from Figure 3-10 that only the top left and
lower right holes are used; the other holes hold the RCU to its mounting
plate. The ambient temperature range for the RCU is -20° to 70°C. Mount
the RCU as close to the sensor as possible. Shorter calibration plumbing
improves response times, reduces calibration gas expense, and reduces
the chance of contaminants in the calibration gas plumbing.
Due to max pressure specification of the RCU valves, the aspirator
air outlet will not have sufficient pressure to run the Blow Back. A
separate high pressure (80 psi minimum) air line will be required to
be run to the sensor apart from the RCU.
NOTE
Summary of Contents for Thermox WDG-V
Page 8: ...viii Thermox WDG V VC VCM with Blow Back This page intentionally left blank...
Page 16: ...xvi Thermox WDG V VC VCM with Blow Back This page intentionally left blank...
Page 22: ...1 6 Thermox WDG V VC VCM with Blow Back This page intentionally left blank...
Page 34: ...2 12 Thermox WDG V VC VCM with Blow Back This page intentionally left blank...
Page 57: ...Installation Guide 3 17 Figure 3 18 RCU flow diagram 3 Span Combustibles and Methane...
Page 58: ...3 18 Thermox WDG V VC VCM with Blow Back This page intentionally left blank...
Page 64: ...3 24 Thermox WDG V VC VCM with Blow Back Figure 3 20 Wiring...
Page 73: ...AMEVision Display User Interface or Communications 4 5...
Page 76: ...4 8 Thermox WDG V VC VCM with Blow Back This page intentionally left blank...
Page 88: ...5 12 Thermox WDG V VC VCM with Blow Back This page intentionally left blank...
Page 91: ...Service and Parts 6 3 Figure 8 1a Wiring diagram for sensor...
Page 96: ...6 8 Thermox WDG V VC VCM with Blow Back Figure 8 3 Thermocouple replacement...
Page 100: ...6 12 Thermox WDG V VC VCM with Blow Back Figure 8 5 Flow sensor replacement...
Page 103: ...Service and Parts 6 15 Figure 8 7 Box Heater Replacement...
Page 105: ...Service and Parts 6 17 Figure 8 8 Combustible Block Heater Replacement...
Page 107: ...Service and Parts 6 19 Figure 8 9 Electronics Board Removal...
Page 114: ...7 4 Thermox WDG V VC VCM with Blow Back This page intentionally left blank...
Page 118: ...A 4 Thermox WDG V Series Analyzers This page intentionally left blank...
Page 126: ...A 12 Thermox WDG V Series Analyzers This page intentionally left blank...
Page 132: ...A 18 Thermox WDG V Series Analyzers This page intentionally left blank...
Page 137: ...PC Configurator Software A 23 Figure 23 Calibration_Calibration Results screen...
Page 138: ...A 24 Thermox WDG V Series Analyzers This page intentionally left blank...
Page 144: ...A 30 Thermox WDG V Series Analyzers This page intentionally left blank...
Page 156: ...A 42 Thermox WDG V Series Analyzers This page intentionally left blank...
Page 164: ...A 8 Thermox WDG V VC VCM with Blow Back This page intentionally left blank...