24 | Model ta3000R Gas Purity Monitor
INSTALLATION INSTRUCTIONS
The installation instructions must be strictly followed for safe and
reliable operation of the analyzer.
If any inconsistencies are encountered during installation, stop im-
mediately. Do not continue the installation without direction from
Ametek customer service.
Tools Suggested for Installation
All connections are made using U.S. standard size conectors.
Open end wrenches: 1/4”, 3/8”, Phillips head screwdriver
Flow Meter (Digital in the sccm range)
Mirror
Magnet
Making Gas Connections
Prepare for Gas Connections
Remove the red plastic shipping cap from the Hg vapor trap (scrubber).
Remove any 1/16” VICI plug from the rear or front panel(s). Remove all
other shipping caps immediately prior to connection of gas supplies.
Connect Carrier Gas (Actuator Gas Supply)
The ta3000 analyzer uses a chromatographic carrier gas that is also used
internally as actuator gas. Matching the carrier gas to the sample will
prevent upsets caused by the elution of the extraneous balance peak. See
gas specifications for Carrier Gas on page 14, Specifications for details. The
instrument connection is made at the “CARRIER” 1/16” VICI port on rear
panel. Pressurize external line to 80 psig (Minimum 70 psig, Maximum 90
psig).
Connect Sample Gas without Front Injection Panel option
The ta3000 analyzer can be used for process or single gas sample analysis.
On-line process sample line should be connected to the “SAMPLE IN”
1/16 “ VICI fitting on the rear panel. Optimal results are achieved with
constant flow rates (20-100 sccm).
!
CAUTION
!
CAUTION
Summary of Contents for ta3000R
Page 43: ...User Manual 43 DIMENSIONAL DRAWINGS ta3oooR Top View ...
Page 44: ...44 Model ta3000R Gas Purity Monitor 22 115 6 92 ta3oooR Side View ...
Page 45: ...User Manual 45 24 070 16 70 Outer Dimensions 3D View ...
Page 46: ...46 Model ta3000R Gas Purity Monitor This page intentionally left blank ...