SECTION 3 – MAINTENANCE 3-5
Six Months
Timer
Accuracy should be verified according to API specs every six months. There are no provisions
for adjusting the timer provided with the instrument. Review your API specs for details.
Air Operated Valve
1.
Relieve system pressure. Remove the valve from the system and place it securely in a vice.
2.
Fully open the valve stem.
3.
Remove the packing gland locking device.
4.
Unscrew the packing gland and remove the packing gland and stem.
5.
Remove the packing from the body. Note the packing and washer arrangement.
6.
Replace the packing and place the packing and packing washers into the valve body.
7.
Replace the stem and packing gland, tightening to the appropriate torque.
8.
Replace the packing gland locking device
.
Annually
Replace the High Pressure Filter, Cylinder Pressure Release Valve, Air to Cylinder Valve, and
Rupture Disk.
Pump
Chandler Engineering recommends that the pump valve body be disassembled, cleaned and
rebuilt by our service department.
Reservoir
Chandler Engineering recommends that the reservoir be removed, cleaned out, and flushed by
our service department.
Heater
Chandler Engineering recommends that the heater be inspected and tested for insulation
breakdown and voltage leakage, which can lead to arcing on the cylinder wall. This
procedure requires the use of specialized test equipment. Insulation breakdown poses two
potentially hazardous conditions: electrical shock hazard to the operator, and pitting of the
cylinder at the point of arcing. Chandler highly recommends that our service department
perform a series of tests on the heater at this time interval.
Summary of Contents for Chandler Engineering 8040D10
Page 8: ...P 4 PREFACE This page is intentionally left blank ...
Page 24: ...3 8 MAINTENANCE OF CONSISTOMETER This page is intentionally left blank ...
Page 28: ...4 4 TROUBLESHOOTING This page is intentionally left blank ...
Page 32: ......
Page 34: ...6 2 SECTION 6 DRAWINGS AND SCHEMATICS 8040 DWGS REV A This page is intentionally left blank ...
Page 35: ......
Page 40: ......
Page 41: ...CHANDLER ENGINEERING ...
Page 42: ...CHANDLER ENGINEERING ...
Page 43: ...CHANDLER ENGINEERING ...
Page 44: ...CHANDLER ENGINEERING ...
Page 45: ...CHANDLER ENGINEERING ...
Page 46: ...CHANDLER ENGINEERING ...
Page 47: ......
Page 50: ...CHANDLER ENGINEERING ...
Page 51: ...CHANDLER ENGINEERING ...
Page 52: ......