SECTION 1 – INSTALLATION 1-1
Section 1 – Installation
Unpacking the Instrument
Re-configuration
1.
Apply power to the instrument.
2.
Make sure the instrument is connected to serial port COM1 on the host computer.
3.
Turn ON the power to the instrument.
4.
Each data channel on each instrument must have a separate address. The DIP
switches at the rear of the instrument are used to configure the data channels.
During normal operation each of the four switches must be set to the OFF
position. During configuration of the address for the SGSA, temperature, or
pressure channels, the DIP switches on the autoclave must be set according to the
table below.
Channel Address Configuration
Normal Operation
Temperature
Pressure
SGSA (Gel and Transit Time)
Summary of Contents for CHANDLER ENGINEERING 5265
Page 10: ...P 6 PREFACE This page is intentionally left blank...
Page 22: ...2 10 SECTION 2 OPERATING INSTRUCTIONS This page is intentionally left blank...
Page 30: ...4 4 SECTION 4 TROUBLESHOOTING GUIDE This page is intentionally left blank...
Page 34: ...6 2 SECTION 6 DRAWINGS AND SCHEMATICS 5265 DWGS REV C This page is intentionally left blank...
Page 36: ......
Page 37: ......
Page 38: ...CHANDLER ENGINEERING...
Page 39: ......
Page 40: ...CHANDLER ENGINEERING...
Page 41: ......