![Ametek Chandler Engineering 1910 Instruction Manual Download Page 17](http://html1.mh-extra.com/html/ametek/chandler-engineering-1910/chandler-engineering-1910_instruction-manual_3044000017.webp)
SECTION 2 – OPERATION 2-5
Plot Screen
The plot screen shows a historical plot of the data.
Pan:
Tap and drag the plot around the screen.
Range:
Auto-scale each Y-Axis from 0 to the highest historical value of each channel.
Auto:
Auto-scale the Y-Axis from 0 to the maximum for each channel.
Clear:
Clears the historical data.
Visibility:
Shows or Hides the currently selected Channels (select the channels from the list
above this button).
Summary of Contents for Chandler Engineering 1910
Page 4: ...T 2 TABLE OF CONTENTS This page is intentionally left blank ...
Page 10: ...P 6 PREFACE This page is intentionally left blank ...
Page 12: ...1 2 SECTION 1 INSTALLATION This page is intentionally left blank ...
Page 21: ...SECTION 2 OPERATION 2 9 Help Screen The Help Screen displays this manual ...
Page 24: ...2 12 SECTION 2 OPERATION This page is intentionally left blank ...
Page 27: ......
Page 29: ...4 2 SECTION 4 TROUBLESHOOTING GUIDE This page is intentionally left blank ...
Page 31: ...5 2 SECTION 5 REPLACEMENT PARTS This page is intentionally left blank ...
Page 33: ......
Page 38: ...CHANDLER ENGINEERING ...
Page 40: ...P1 P7 P11 PLC1 P3 P18 P12 P5 P6 CHANDLER ENGINEERING ...
Page 41: ...CHANDLER ENGINEERING ...