
13
STEP 6: LIFTING CHAIN
The chain comes in separate length, one per section of rail
Once the rail system with gear motor, and head assembly in place, rail
system anchored to the wall with carriage in place, consider installing the
lifting chain
Never drop the chain on the floor or onto any surface since the grease on
it would catch any debris or dust and stick to che chain untill properly
cleaned and relubricated. Use rubber gloves to prevent staining your hand
for the rest of the install.
Master Link is provided for each chain joint, use only the provided link to
joint the lifting chain, master link are also load rated and part of the lifting
system.
Place entire chain length on the carriage
Attach one chain end to lifting point of the brake assembly using master
link provided
Route chain over head idler sproket
Drop chain down the runway trough chain guide at each brace
LIFTING POINT