![America's Heat AHB-170P Owner'S Manual Download Page 6](http://html.mh-extra.com/html/americas-heat/ahb-170p/ahb-170p_owners-manual_2922155006.webp)
5
Unpacking and Setup
After removal of shipping container, position storage bin on storage bin base at desired angle for
installation.
Install auger assembly by sliding auger boot (with clamp) over bin outlet; align elbow on bin auger
tube directly over boiler fuel inlet. Tighten auger boot clamp securely. It is advisable to install two
sheet metal screws (not supplied) thru the clamp, auger boot, and into the hopper bin outlet to insure a
permanent connection. Install fuel delivery coupler between bin auger tube and boiler fuel inlet. (See
Figure 1)
Fasten flex conduit extending from storage bin auger assembly to boiler auger motor housing using
conduit lock nut. (See Figure 1)
Connect one black auger motor lead to the two orange wires with wire nut connector. Connect the
other black auger motor lead to the two white wires using wire nut connector. (See Figure 1)
FIGURE 1
Figure 1: Unpacking and Setup