- 4 -
M965925 (5/18)
• Complete the installation of the Finished Floor. Tile as close to the PLASTER GUARD
(3)
as you can.
• Caulk between Finished Floor and PLASTER GUARD
.
FINISH FLOOR INSTALLATION
5
HOT
COLD
FRONT
FINISHED FLOOR
ROUGH FLOOR
3
Page 1: ...in relation to wall note roughing in dimensions Flash Rough Valve Kit INSTALLATION INSTRUCTIONS R950 R950SS R950 R950 R950SS R950SS Tubing Cutter Adjustable Wrench Channel Locks Flat Blade Screwdriver...
Page 2: ...ectly level Secure WOOD SUPPORT 1 to floor joists Check for level again Sweat together Hot and Cold Supply assemblies Apply sealing tape to threaded connections Thread supply assemblies into rough in...
Page 3: ...Fig 1 HOT COLD FRONT Check that top of the ROUGH IN VALVE 1 is level in all directions If the ROUGH IN VALVE 1 is not level follow the steps below 1 Loosen the four MOUNTING NUTS 2 2 Adjust the LEVELI...
Page 4: ...Complete the installation of the Finished Floor Tile as close to the PLASTER GUARD 3 as you can Caulk between Finished Floor and PLASTER GUARD 3 FINISH FLOOR INSTALLATION 5 HOT COLD FRONT FINISHED FLO...
Page 5: ...Fri 8 00 a m to 8 00 p m EST Saturday 10 00 a m to 4 00 p m EST IN CANADA 1 800 387 0369 TORONTO 1 905 306 1093 Weekdays 8 00 a m to 7 00 p m EST IN MEXICO 01 800 839 1200 Product names listed herein...