M968852 Rev.1.3
4
3
INSTALL HANDLES
GROOVE
GROOVE
FINISHED WALL
1
1
4
8
9
5
6
7
4
2
DRAIN INSTALLATION
Assembly GASKET
(2)
WASHER
(3)
and LOCKNUT
(4)
onto DRAIN BODY
(1)
.
Tighten LOCKNUT
(4)
firmly.
Assembly TAILPIECE
(5)
to DRAIN BODY
(1)
.
Apply a bead of PUTTY to underside of FLANGE on DRAIN BODY
(1).
Feed DRAIN BODY
(1)
down through lavatory.
LAVATORY
PUTTY
2
3
4
5
1
2
INSTALL WALL SPOUT
Remove PLASTER GUARDS
(1)
from valve bodies.
Inspect that SPOUT NIPPLE O-RING
(2)
is seated in groove of SPOUT NIPPLE
(3)
.
Thread SPOUT MOUNT
(4)
onto SPOUT NIPPLE
(3)
. Align groove on SPOUT MOUNT
(4)
with face of finished wall. See Figure A.
Install SEAL
(5)
into SPOUT ESCUTCHEON
(6)
. Place SPOUT
ESCUTCHEON
(6)
with SEAL
(5)
onto SPOUT MOUNT
(4)
.
Push SPOUT
(7)
onto SPOUT MOUNT
(4)
. Align SPOUT
(7)
and tighten SPOUT SET SCREW
(8)
with 3mm HEX WRENCH
(9)
supplied.
Figure A
1
MAX
W
A
L
M
I
N
1
-5/
8"
D
E
MAXW
AL
L
M
IN
1-5
/8"D
EEP
3
1
5
2
3
4
Thread HANDLE BASE
(4)
onto HANDLE ESCUTCHEON
(3)
until seated tightly against HANDLE ESCUTCHEON
(3)
.
Place O-RING
(2)
into HANDLE ESCUTCHEON
(3)
.
Thread HANDLE ESCUTCHEON
(4)
onto VALVE
(5)
until
snug against finished wall.
Turn VALVE STEMS
(1)
to off position.