background image

M968852 Rev.1.3

Certified to comply with ASME A112.18.1M
U.S. Patent No. 5,819,789
    

HOT

COLD

Turn off hot and cold water

supplies before beginning.

CAUTION

Installation

Instructions

2064.451

ROUGHING-IN DIMENSIONS

1

2" D.

(52mm)

1"
(25mm)

2" MIN.
(51mm)

3" MAX.
(76mm) MAX.

FINISHED

WALL

FINISHED

WALL

2" D.
(52mm)

9-1/4" 

(235mm)

1/2" NPT INLETS

8"

(203mm)

4"

(102mm)

CROSS

HANDLE

1

INSTALL VALVE BODY

Determine where the finished wall location will be. 

This measurement

is very important!  

Note: The rough-in measurement from the finished

wall is; 2" minimum and 3" maximum. This is a 1" tolerance. See

rough-in illustration above.   

Secure FAUCET BODY 

(1)

 to cross brace of wall structure

at required height using two wood screws.

Turn valves to off position. Turn hot and cold supplies on and

check fitting connections for leaks .

Complete wall construction.

WOOD SCREWS

HOT

COLD

CROSS BRACE

WALL STUDS

16"

MAXW

AL

L

M

IN

1-5

/8"D

EEP

MAXW

AL

L

M

IN

1-5

/8"D

EEP

Connect HOT water supply to left VALVE inlet and COLD water

supply to right VALVE inlet. Use pipe sealant or Teflon tape for

all threaded connections. For sweat connections, do not make

sweat connections directly to valve body. Damage to seals and

and valve cartridge may occur.

Required Tools

Flat Blade Screwdriver

Adjustable Wrench

Channel Locks

2-1/8" D.

(54mm)

2" MAX. 

(51mm) MAX.

1-1/4" O.D.

(32mm) O.D.

Pipe Wrench

Teflon Tape

Plumbers' Putty or

Caulking

Tubing Cutter

WALL MOUNT FAUCET

IN-WALL LAVATORY FITTING

SERIN

To ensure that your installation proceeds smoothly-please read these instructions carefully before you begin.

Thank you for selecting American-Standard...
the benchmark of fine quality for over 100 years.

To ensure that your installation proceeds smoothly--
please read these instructions carefully before you begin.

Reviews: