background image

- 2 -

- 3 -

Installation

Installing the S-Connector

1

1

Installing the Faucet

2

3

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20

Index Button
Screw
Handle
Cap
Nut
Cartridge
Diverter Valve
Body
Nut
O-Ring
Screw
Washer
Escutcheon
S-Connector
Aerator
Hose
Screw
Shower Hanger
Shower
Body

1
1
1
1
1
1
1
1
2
2
2
2
2
2
1
1
1
1
1
0

FFAS0711 / FFAS0712

35~40

15

0

2

(Cold)

(Hot)

S-Connector

Finished Wall

Escutcheon

Washer

Nut

Faucet

2

1

3

30

3

2

4

Screw

1

2

5

6

1

3

4

5

6

7

9

8

10

11

12

13

14

15

16

17

18

19

20

1
1
1
1
1
1
0
0
2
2
2
2
2
2
0
1
1
1
1
1

* Consult the dimension 
drawing and lay the pipes.
* Wash and clean the 
water supply pipeline.

Anchor

Shower Hanger

Installing the Shower Hanger & Hose

S

-Connector

Water Supply 
Pipeline (Hot)

Water Supply 
Pipeline (Cold)

Parts List

No.     Part Name                Q’ty

Parts List

Level

Reviews: