- 2 -
- 3 -
Installation
Installing the S-Connector
1
1
Installing the Faucet
2
3
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
Index Button
Screw
Handle
Cap
Nut
Cartridge
Diverter Valve
Body
Nut
O-Ring
Screw
Washer
Escutcheon
S-Connector
Aerator
Hose
Screw
Shower Hanger
Shower
Body
1
1
1
1
1
1
1
1
2
2
2
2
2
2
1
1
1
1
1
0
FFAS0711 / FFAS0712
35~40
15
0
2
(Cold)
(Hot)
S-Connector
Finished Wall
Escutcheon
Washer
Nut
Faucet
2
1
3
30
3
2
4
Screw
1
2
5
6
1
3
4
5
6
7
9
8
10
11
12
13
14
15
16
17
18
19
20
1
1
1
1
1
1
0
0
2
2
2
2
2
2
0
1
1
1
1
1
* Consult the dimension
drawing and lay the pipes.
* Wash and clean the
water supply pipeline.
Anchor
Shower Hanger
Installing the Shower Hanger & Hose
S
-Connector
Water Supply
Pipeline (Hot)
Water Supply
Pipeline (Cold)
Parts List
No. Part Name Q’ty
Parts List
Level