- 4 -
- 5 -
Preparation
`a
C
D
1
Insta
ll
ation
`aEF
16
17
Product Insta
ll
ation
`a
2
3
16
17
b)PòMn
c)PòMn
G 1/2”
F
loor
óô
õö÷
6
ø
ù
9
0
0
~
1
0
0
0
a
b
15
0
Cente
r line
R
e
c
o
m
m
e
n
d
e
d
9
0
0
~
1
0
0
0
c
d
úÉ
Wa
ll se
at
Co
ld w
ater supp
ly pipeline
hole Depth 40
$%
40
Hot water supply pipeline
* Lay cold
hot supply pipes based on dimension drawing.
*
ûüýþ,!
"b、cP)Mn
&
。
S-Connector Installation
S
`a ²>M
1
*
`a,|
#!
"
(Mn
$+
&'。
36~4
1
15
0
2.
“
”
X
#
'
>
M
aWP)
S
c)PòMn
S
²>M
b)PòMn
2
)
Cold water supply pipeline
Level
2. Install the S-Connector
S-Connector
Hot water supply pipeline
* Before installation, the laying of pipeline
is rinsed clean.
2
Teflon Tape
!"#
3
15
15
6
8
8
9
9
4
7
10
10
5
14
25
26
20
19
18
28
29
27
23
24
10
21
9
1
2
22
úÉ
-
(
Wall seat position
11
13
Rotate the
nuts to the
lower end
of the
thread on
the bolts
¤½
#$%
#&
+
#'
()
12
Rotate the nuts to contact
the lower plane of the rib
on the body
¤½
#$
<
L
ô
[kv
+
y
z
hR
{
)
The outlet pipe is level with
the ceramic tile wall.
_
:O-
|
ô
}
~
R
h。
≤
∮
Installation hole
30mm
30
k
≤
∮