background image

Installation

Instructions

Certified to comply with ANSI A112.18.1

Recommended Tools & Materials

ROUGHING-IN DIMENSIONS 

Thank you for selecting American-Standard...the benchmark

of fine quality for over 100 years.
To ensure that your installation proceeds smoothly--please

read these instructions carefully before you begin.

M 9 6 5 117   R E V.  1. 1

16 6 2 . 2 12

16 6 2 . 2 2 2

Electric Drill

Torch

6mm (15/64")

Drill Bit

Pencil

Phillips Screwdriver

OPTIONAL TO

FINISHED FLOOR

USUALLY BETWEEN

36

"

48

"

TO

Hammer

COMMERCIAL SHOWER

SYSTEM KITS: 1.5gpm & 2.5gpm

1662.222

1662.212

TOP OF TUB RIM

BOTTOM OF TUB

74" FOR HEAD

CLEARANCE

4"

18"

OPTIONAL

5-1/8" REF.

12"

OPTIONAL

OPTIONAL

12"

OPTIONAL

1/2" COPPER

1/2" SUPPLIES

PLUG TUB

OUTLET

6" DIA.

1" MIN.

8"

VALVE BODY HAS 1/2"

SWEAT INLETS AND OUTLETS

5-3/4"

33-3/8

"

1-1/4

"

1/2

"

45˚

1/2

"

 NPT

FINISHED WALL

2-3/4" DIA.

Adjustable Wrench

10'

Pipe Wrench

Tubing Cutter

Tape

Measure

Sealing Tape

1660.505

1660.502

2-5/8"

 1/2" NPSM 

 1/2" NPSM 

 9-1/2"

3-3/8"

Installation must conform to all local building codes.

 9-1/2"

Reviews: