OPTIONAL ITEMS
2
PRE-INSTALLATION TEAR DOWN
FAUCETS
SHAMPOO BOX
SHOWER BENCH
TIME REQUIRED
8-16 HRS
This shower system is designed to be installed on a bare floor. It is necessary for any existing shower to be completely removed.
Tear out and remove all old material to expose the 2 x 4 wall studs. Clean up the shower area, removing all dust and old material from the area.
3
DRY-FITTING THE PAN
TIME REQUIRED
½ to 1 HR
3/4” overhang when using triple studs, no overhang when using
double studs (double studs required, triple studs recommended for
extra strength).
11” for shampoo shelf
triple studs
3/4” overhang
11”
minimum gap
required for the
shampoo shelf
diagram 2
Studs may need slight trimming to
allow pan to set flush.
1/2” cement board
2 x 4 stud
metal flange
pan
diagram 1
floor of pan
silicone bead
It is easier to check alignment of studs and pan without the drain installed into the pan. Place the pan in the planned position. Check to see that the spac-
ing between the metal pan flange and 2 x 4 studs are flush. Some shimming or sanding of the 2 x 4 studs may be required to flush the studs with the metal
pan flange. When screwing in the 1/2” cement board the metal flange will pull fast to the studs, and will secure the metal pan in place.
(diagram 1)