C - Installing Panels
1.
2.
3.
Press the wall firmly into position. Be sure to use spacers between the
bottom panel and the shower pan to ensure panel is level.
(diagram 17)
4.
Install the remaining panels in the following order:
2, 1, L2, L1, 4, 3
diagram 17
3
4
2
1
L1
L2
5. Match the space between the panels with the rest of the grout lines
on the panel. Use spacers if necessary to make the walls square and
straight.
OPTIONAL SHAMPOO SHELF INSTALLATION
TIME REQUIRED
1/2 - 1 HR
11
4. On the 2 tiles the Shampoo Shelf will be replacing,
mark 1" from the outside of the grout line, the cut-
out area will be 10" x 22". Cut out the hole for the
Shelf. The smaller the hole the better.
5. Dry-fit the Shampoo Shelf for alignment of grout
lines.
6. Using 100% Silicone in-place with a generous
bead around the back of the lip, wipe off excess
silicone with tissue.
1. The Shampoo Shelf was designed to match your tile
size. 12" x 24" tiles, the cut-out hole size is 10" x 22".
2. There is a 1" lip or frame around the Shampoo Shelf,
this will be the water sealed area for the Shampoo
Shelf.
3. The best way to cut the hole is with a small 5" round
diamond blade and with a jigsaw to cut the corners.
See detailed instructions enclosed with Shampoo
Shelf
WALL PANEL/LINER INSTALLATION
(continued)
TIME REQUIRED
3-4 HR
10
Remove all dust and dirt with a clean dry cloth. This will increase the
bond to the 100% silicone.
Start with the bottom panel apply a generous amount of 100%
silicone to the cement board and to the back side of the wall
panel. Refer to the manufacturer’s recommendations for
application and drying time.
Br aces may be required to keep walls flush