background image

K3 and KT3 OWNER'S MANUAL

4209-42  08/06/21

Page 1 

Technical support:  1-320-286-3500        1-800-363-0251          [email protected]

K3 & KT3 STEAM BATH CONTROLS

FOR USE WITH AMEREC

AK STEAM GENERATORS

SAVE THIS MANUAL

FOR THE SAFETY OF YOU AND YOUR FAMILY PLEASE READ THE WARNINGS TO 

THE RIGHT AND ALL INSTRUCTIONS BEFORE USING YOUR STEAMBATH.

POST "WARNING" LABEL OUTSIDE STEAMBATH FOR SAFETY WARNINGS. 

REQUIRED POSTING ON DOOR OF STEAM ROOM OR ADJACENT TO DOOR FOR 

ALL COMMERCIAL INSTALLATIONS.

Thank you for purchasing your new AMEREC steam generator. If we can be of any assistance do not hesitate 

to call our Service Department at 1-800-363-0251 or 1-320-286-3500.

The K3 and KT3 controls provide automatic temperature control with AK steam generators. These 

controls allow the user to set steam bath time and to adjust the bath operating temperature.
Note: For a temperature controlled steam bath, the AK generator requires either a KT3 with built 

in temperature sensor or a K3 with separate temperature sensor. Another K3 may be added to 

allow two controls for a steam bath, such as one inside the room and one outside, but 

if a KT3 is 

installed it must be inside the steam room

. A maximum of two controls may be installed.

1. Ensure that both the power circuit and water supply to the generator are ON.
2. To activate the steam, press the K3 (or KT3) control's On/Off switch. In 10 to 20 minutes 

    the room should be comfortable enough to begin taking a steam bath. The unit will turn off 

    automatically in 30 minutes. Note: 

other bath times and temperature may be set by the user.

3. Remove clothing and jewelry.
4. Enter the steam room and close the door to prevent steam from escaping.
5. Relax and enjoy the warm steam releasing tense muscles and refreshing the entire body. The 

    average time spent taking a steam bath is approximately 10 minutes
6. Pressing the control's on/off switch while the steam generator is operating will shut it off. 
7. If your steam room has a shower, a pleasant experience can be achieved by taking a warm  

    shower while in the steam.  You will find the contrast from water to steam quite invigorating. 

 SECTION 1: USING THE  K3/KT3 WITH An AMEREC GENERATOR

AK STEAM GENERATOR

K3 and KT3

WARNING

Electrical grounding is required 

 on all Steam Generators.

All electrical supplies should be

disconnected when servicing a 

Steam Generator.

All wiring must be installed by a 

licensed electrical contractor in 

accordance with local and 

national codes.

All plumbing must be installed 

by a licensed plumber in 

accordance with all applicable 

local and national codes.

Steamers are for indoor use only.

Steamers are not for 

space-heating purposes.

Be certain that steam bath 

enclosures are properly sealed 

to avoid water damage from 

escaping steam. It is 

recommended that 100% 

silicone caulk be used to seal 

all pipes and fittings. Steam

 

must be prevented from

escaping into the wall cavity.

Never shut off the water to an 

appliance that is in use.

Electric Shock Hazard

High Voltage exists within this equipment. 

There are no user serviceable parts 

in this equipment. 

REDUCE  THE RISK OF

1. Exit immediately if uncom fortable, dizzy or slee py.  St aying too long in

    a heated area is capa

ble of causing  overheating.

REDUCE  THE RISK OF

Use care when enter ing or  exiting the steam room, floor ma y be slippe ry.

NOTE :  For additional sa fety instructions, see  owner's manual .

CA UTION!

 

Do not contact steam head . St ay at least 12"  away

from hot steam escaping from the steam outlet.

OVERHEA TING AND SCALDING

2. Supe rvise children at all tim es .

3. Chec k with a doctor be fore use if pregnant, diabetic , in poor health or

    under medical car e.
4. Breathing heated air in conjunction with consumption of alcohol, dr

ugs

   or medication is capa ble of causing unconsciousnes s.

SLIPPING AND F ALL INJU RY

WARNING

4110-79

05-21-07

1 2 O

o

Summary of Contents for K3

Page 1: ...approximately 10 minutes 6 Pressing the control s on off switch while the steam generator is operating will shut it off 7 If your steam room has a shower a pleasant experience can be achieved by taking a warm shower while in the steam You will find the contrast from water to steam quite invigorating SECTION 1 USING THE K3 KT3 WITH An AMEREC GENERATOR AK STEAM GENERATOR K3 and KT3 WARNING Electrica...

Page 2: ...t or possibly pregnant women should consult a physician regarding correct exposure e Obese persons and persons with a history of heart disease low or high blood pressure circulatory system problems or diabetes should consult a physician before using a steambath f Persons using medication should consult a physician before using a steambath since some medi cation may induce drowsiness while other me...

Page 3: ...ustable from 5 to 60 minutes in 5 minute increments A jumper on the steamer board may be set for a bath time settable up to 24 hours max in 1 hour increments To check the time setting turn on the steam bath then press the TIME switch The set time will immediately be displayed Continue holding the switch for 5 seconds and the setting will begin to change Continue pressing the switch and the TIME se...

Page 4: ...ox and the tiles should be finished over the plate and up to the hole edges to leave the control s mounting hole clear See Figure 4 3 INSTALL K3 or KT3 CONTROL The low voltage K3 control can be mounted directly to a finished wall either inside or outside the steam room The low voltage KT3 control must be mounted in side the steam room See step 2 above The control cable should already be roughed in...

Page 5: ...eaker then contact Support Water runs out of steamhead Generator Faulty 1 Turn off the breaker 2 Turn off the water supply 3 Contact Support Steam room too hot or cold Temperature setting needs changing 1 See section 3 Setting Time and Temp 2 Contact Support Control ON Displays Steambath temperature over 132 F 55 C or Sensor faulty 1 If the bath is too hot turn off the circuit breaker and contact ...

Page 6: ...his procedure should be scheduled monthly or more often depending on local water conditions and steam bath usage Flushing Procedure The generator should be cool before starting 1 Use the control to start a bath Immediately go to the generator and open the manual drain open is with the handle in line with the drain pipe closed has the handle pointing straight out over the side of the pipe 2 Allow t...

Reviews: