
17
THERMAL
GND
GND
GND
GND
SENSOR
DOOR
BMS
DATA
GND
+12V
BASE UNIT
(located in air curtain)
230V 50Hz
Mains Supply
Chassis
Earth
PROGRAM PANEL
(rear view shown)
External
Switch
J1
Remove link J1 for
external time switch
DATA
GND
+12V
F1
F2
F3
N
N
AC1-
T3
L3
AC2-
T3
AC1-
T2
L2
AC2-
T2
AC1-
T1
L1
AC2-
T1
Door
Switch
Sensor
Terminal
Description
Cable
N Neutral
4mm²
max
L
3 phase supply
4mm² max
12V
Supply to remote unit
DATA
Supply to remote unit
GND 0v
Terminal
DOOR option
Door
Contact
BMS
option BMS switch
SENSOR
option Internal/External Sensor
GND
option 0v terminals
4.4 Installer Wiring - LPHW
The program panel is connected to the base unit via a set of 3 way connectors marked "+12V”, “DATA”
and “GND". Interconnecting wiring is via
Belden cable
as shown.
Max length 50m.
It is recommended that this control cable is run separately
within its own trunking to avoid external interference.
Door switch to be volt free and wired normally closed i.e.
broken when door is open.
External switch (ie BMS enable) to
be volt free and wired via normally
open contacts.
Internal/External sensor bead to be
wired low voltage.
Protection
External circuit breaker with the appropriate
rating should be installed for the protection
of the installation.
Summary of Contents for AIRBLOC ACR Series
Page 43: ...43 Notes...