Settings
A BAH0040-9 01.19
39
6.7.7
Calibration test for implements with full metering (pneumatic seed drills)
1. Prepare the seed drill for the calibration test as described in the seed drill operating manual (set
up calibration trough, .....).
2. Press
.
3.
Up to year of manufacture 2015:
Enter the code number of the metering roller
See table Fig. 62, Seite 66
See section Enter implement data, page 26.
Set the calibration value to 1,000 (see Mode 15, Seite 60)
4.
As of year of manufacturer 2015:
Enter the code number of the metering roller
See table Fig. 62, Seite 66
See section Enter implement data, page 26.
The calibration factor will be automatically set to 1,000 (see Mode 15, Seite 60).
5. Press
.
6. Press
.
7. Enter the desired spread rate (kg/ha).
8. Press
.
9. Press
.
10. Enter the subsequent, anticipated working speed (km/h).
11. Press
.
12. Press
.
13. Press
.
Start the metering roller drive (electric motor) for approx. 3 seconds [the time can be set in Mode
8 ()].
The cells of the metering wheels are filled.
14. Wait until the metering roller drive has come to a standstill.
Summary of Contents for AmaDrill+
Page 23: ...Layout and function AMADRILL BAH0040 9 01 19 23 Fig 16 ...
Page 70: ......
Page 71: ......