![Amadas SPC-4 Manual Download Page 28](http://html1.mh-extra.com/html/amadas/spc-4/spc-4_manual_2915877028.webp)
Hi-Speed Cotton Stalk Puller/Chopper
Preparation
MAN157
7/1/21
17
Dealer Preparation
Initial Inspection
Upon receiving the Hi-Speed Cotton Stalk
Puller/Chopper, perform the following
inspection:
1. Examine the machine for transport
damage. If the machine is damaged in
any way, contact
Amadas Industries
at
once.
2. Open the top covers and visually inspect
all gearboxes for oil leaks.
3. Remove the left side shield (facing
machine) and visually inspect the tension
of the chain. The chain should have 1/2"
to 1" play or movement in the slack side.
Remove shield
4. Remove the lower shield and inspect the
lower chain. The chain should have 1/2"
to 1" play or movement in the slack side.
Chains
Remove
shield
WARNING
Replace shields!! Never operate
machine without shields!!
Summary of Contents for SPC-4
Page 9: ...Hi Speed Cotton Stalk Puller Chopper Introduction 07 06 21 vii MAN157 Dimensions SPC 4...
Page 10: ...Introduction Hi Speed Cotton Stalk Puller Chopper MAN157 viii 07 06 21 Dimensions SPC 6...
Page 11: ...Hi Speed Cotton Stalk Puller Chopper Introduction 07 06 21 ix MAN157 SPC 4 SPC 6...
Page 23: ...Safety Hi Speed Cotton Stalk Puller Chopper 12 07 01 21 MAN157 Decals...
Page 24: ...Hi Speed Cotton Stalk Puller Chopper Safety MAN157 07 01 21 13 Decal Locations...
Page 25: ...Safety Hi Speed Cotton Stalk Puller Chopper 14 07 01 21 MAN157 NOTES...
Page 35: ...Preparation Hi Speed Cotton Stalk Puller Chopper 24 7 1 21 MAN157 NOTES...
Page 43: ...Operation Hi Speed Cotton Stalk Puller Chopper MAN157 32 7 1 2021 NOTES...
Page 64: ...Hi Speed Cotton Stalk Puller Chopper Troubleshooting 7 1 2021 53 MAN157 6 Troubleshooting...
Page 67: ...Troubleshooting Hi Speed Cotton Stalk Puller Chopper 7 1 21 56 MAN157 NOTES...