
Step 1B
For Drywall
D
D
B
B
E
E
1B-4 Install the side frames [B] using lag screws
[D] . Tighten the lag screws [D] only until they are
pulled firmly against the wall.
1B-3 Secure the drywall anchors [E] into the 4
pilot holes using phillips screwdriver.
1B-1 Attach the boards [A] to the side frames
[B].
1B-2 Position the assembled floating shelf on
your desired height and level it. Then mark the 4
pilot holes using a pencil(not included).
[Not Included]
[Not Included]
You may need
assistance with
this step.
B
B
A
A
A
01
02
03
04
05
Summary of Contents for AMFS15
Page 7: ......