21
Put the top panel on the structure then align the screw holes and tigthen the
flange nuts with the domed head screws M6.
STEP 12 . ASSEMBLY TOP PANEL
Place the 3 15 mm holes
on the top panel towards
the back side.
Fasten the top panel with
12 screws domed head M6
12mm.