Chapter 3 - Commissioning
Operation Verification
BreezeACCESS EZ AU-EZ
29
System Manual
3.3
Operation Verification
The following sections describe how to verify the correct functioning of the ODU
and IDU.
3.3.1
Outdoor Unit Verification
To verify the correct operation of the Outdoor Unit, examine the LED indicators
located on the bottom panel of the outdoor unit.
The following tables list the provided LEDs and their associated indications.
NOTE
Verifying the correct operation of the Outdoor Unit using the LEDs, as described below, is only
possible after the configuration process is completed.
Table 3-3: AU-ODU LEDs
Name
Description
Functionality
W-LINK Wireless
Link
Indicator
Green - Unit is associated with one or more
SUs
Blinking red - No associations
Off - Wireless link is disabled
Status
Self-test and
power indicator
Green - Power is available and
self-test passed.
Blinking Amber - Testing (not ready for
operation)
Red - Self-test failed - fatal error
ETH
Ethernet activity/
connectivity
indicators
Green -Ethernet link detected.
Amber - No Ethernet connectivity between
the indoor and outdoor units.
Summary of Contents for BreezeACCESS EZ AU-EZ
Page 1: ...BreezeACCESS EZ AU EZ System Manual Software Version 6 0 December 2009 P N 215449 ...
Page 20: ...1 Chapter System Description ...
Page 32: ...2 Chapter Installation ...
Page 43: ...3 Chapter Commissioning ...
Page 50: ...4 Chapter Operation and Administration ...
Page 148: ...A Appendix Software Version Loading Using TFTP ...
Page 152: ...B Appendix File Download and Upload Using TFTP ...
Page 155: ...C Appendix Using the Set Factory Defaults Utility ...
Page 157: ...D Appendix Preparing the Indoor to Outdoor Cable ...
Page 160: ...E Appendix Parameters Summary ...