*An inhibitor capsule unique to Alurad is fitted to all radiators during manufacture in order to provide protection against all kinds of corrosion. If the system as a whole
is desired to be protected against freezing as well as various kinds of corrosion, the use of ANTICOR 121 is recommended.
Feniþ Teknik
may not be held liable for
any problems that might arise from the use of another corrosion inhibitor or antifreeze.
Cause the radiator slide down the bracket slides
from top of the brackets (Figure 5). If the place of
mounting does not permit sliding down from the
top due to the presence of parapet, first fix the
radiator to one of the brackets from its side
(Figure 3 a), and then fit it into its place by
pushing in the other bracket.
Figure 3 a
Distance between the bracket slide ends (mm) =
(40x Number of Radiator Columns) – 5mm
Figure 7
Figure 6
Figure 5
Placement of Direction Plug
In making the lower opposite end connection,
the direction plug shell be placed at the following
locations as counted from the hot water inlet,
using the pusher supplied:
c)For radiators with up to 10 columns, between
columns 3 and 4
d)For radiators with more than 10 columns,
between columns 4 and 5
Lower Opposite End Connection
Alurad Radiators allow the making of lower
opposite end connection without causing any
reduction in yield. To meet this purpose, the
“ direction plug and pusher “ shown in Figure
7 will be put into the packing, if a request is
made for them in the purchase order.
Fit the screws into the plastic inserts provided
on the side brackets, and tighten them (Figure 6).
Note: Where the lenght of radiator exceeds
140 cm or the number of columns exceeds 18,
support the radiator with one supporting bracket,
and where the length exceeds 240 cm or the
number of columns exceeds 30, support it with
two supporting brackets (Figure 1, No 4). Place
said supporting brackets to the lower edge of
upper water channel as to face the slides and to
the middle section of the radiator.
Figure 4
Keeping the clapper closed while the
system is in operation will ensure
maximum heat efficiency.