Alumax SPEEDSTALL 794S Series Installation Instructions Manual Download Page 7

G03711103

8-22-06

Page 7 of 9

10

Snap the fillers [

P

] into the curb assembly [

A

] and

header assembly [

D

] between the door jambs with the

raised lip to the exterior and the pivot holes toward the
pivot jamb [

M

].  Center the curb filler in the curb between

the pivot and strike jamb [

N

] (use masking tape to hold in

position).

NOTE:  The snap-in fillers should be exactly 3/8" longer
than the door panel width.

11

Pull the bottom end of the pivot jamb [

M

] tight to

the curb filler [

P

] and plumb the jamb.  Drill two 1/8"

holes thru the pivot jamb and into the 135° post [

J

] in line

with the screws in the head and curb and approximately
1/4" vertically from the ends of the jamb.  Drill a third
hole centered between the first two.  Attach the pivot
jamb permanently with three #8 x 1/4" truss head screws
[

C

].

Slide the header filler [

P

] tight against the pivot jamb.

Push the strike jamb [

N

] tight against the fillers top and

bottom.  With the pivot jamb plumb and both fillers tight
between the two door jambs, the strike jamb also will be
plumb and parallel to the pivot jamb.  Attach the strike
jamb to the other 135° post [

J

] in the same manner as the

pivot jamb.

12

Insert the two #10-24 x 7/16" square head set

screws [

W

] into the threaded holes in the pivot blocks in

the top and bottom rails of the glazed door panel [

L

].

Position the pivot pins 1 1/2" from the pivot side of the door
(the side opposite the magnetic strip).  Tighten the set
screws just enough to prevent the pivot blocks from
moving (finger tight plus a quarter turn).  A 3/16" wrench
(not supplied by A

LUMAX

) will fit the set screw heads

Press the white nylon spacer [

X

] over the bottom pivot pin

on the door panel.

Summary of Contents for SPEEDSTALL 794S Series

Page 1: ...G03711103 8 22 06 Page 1 of 9 INSTALLATION INSTRUCTIONS 794S SERIES SPEEDSTALLTM SHOWER ENCLOSURE Copyright Alumax Bath Enclosures 1997 All rights reserved...

Page 2: ...the enclosure Make sure wall jamb bumpers are securely fastened in place per the installation instructions GLASS USAGE AND HANDLING WARNINGS a TEMPERED GLASS CANNOT BE CUT Attempting to cut tempered g...

Page 3: ...2 Clear Vinyl Jamb Seals L 1 Glazed Door Panel M 1 Pivot Jamb N 1 Strike Jamb Magnetic P 2 Snap in Fillers R 1 Drip Rail S 2 Drip Plugs T 1 Tapered Drip Vinyl V 1 Roll of Double Stick Tape W 2 10 x 7...

Page 4: ...w four 8 x 1 4 truss head screws C through the slots in the anchor plates into the curbs As you tighten the screws be sure the mitered ends are forced tightly together To increase the rigidity of the...

Page 5: ...ng the inside of both of the pencil lines marked in Step 3 Carefully replace the curb assembly in the exact position marked Caulk the inside of the curb ends where they meet the wall Caulk generously...

Page 6: ...magnetic strip over the two 135 posts J Refer to Step 1 for the proper handing of the door NOTE The magnetic strip on the strike jamb must face the exterior and the clear vinyl jamb seal on the pivot...

Page 7: ...ivot jamb permanently with three 8 x 1 4 truss head screws C Slide the header filler P tight against the pivot jamb Push the strike jamb N tight against the fillers top and bottom With the pivot jamb...

Page 8: ...vot bushing in the header filler Hold the door vertical and insert the bottom pivot pin into the pivot bushing in the curb filler It may be necessary to remove the header retaining screws and raise th...

Page 9: ...king like new we recommend the Alumax ShowerBright Consumer Maintenance Kit The Consumer Maintenance Kit surface should be applied every 45 to 60 days To purchase or for more information contact your...

Reviews: