![Altronix TROVE T2SSK78 Installation Manual Download Page 2](http://html.mh-extra.com/html/altronix/trove-t2ssk78/trove-t2ssk78_installation-manual_2913528002.webp)
- 2 -
Trove2 S2 ULXB Kits Installation Guide
Overview:
Altronix T2SSK78 and T2SSK7514 Trove S2 kits are pre-assembled and consist of Trove enclosures/backplanes with factory installed Altronix
power supply/chargers and sub-assemblies. Both kits accommodate Lenel-S2 (S2 Security Platform) S2-INST Installation Kit for S2 Network
Node for up to eight (8) (T2SSK78(D)) or fourteen (14) (T2SSK7514(D)) doors in a single enclosure.
Configuration Chart:
Altronix
Model
Number
Power
Supply
Board
Input
Fuse
Rating
Power
Supply
Board
Battery
Fuse
Rating
115VAC
60Hz
Input
Current
(A)
Maximum Supply
Current for Main and
Aux. Outputs on
Power Supply board
and ACM8(CB) Access
Power Controllers’
outputs
Nominal
DC
Output
Voltage
Range
(VDC)
Fail-
Safe/
Fail-
Secure
Outputs
Additional
Fused
(PTC)
Outputs
ACM8
(CB)
Board
Input
Fuse
Rating
ACM8
(CB)
Board
Output
Fuse
(PTC)
Rating
PDS8
(CB)
Board
Input
Fuse
(PTC)
Rating
PDS8
(CB)
Board
Output
Fuse
(PTC)
Rating
PD8UL
(CB)
Board
Output
Fuse
(PTC)
Rating
T2SSK78
5A/
250V
15A/
32V
4.2
24VDC @ 9.7A
20.17-
26.4
8
8
10A/
250V
3.5A/
250V
10A/
32V
3A/
32V
–
T2SSK78D
2.5A
9A
2.5A
T2SSK7514
15A/
32V
6.9
24VDC @ 9.4A
20.17-
26.4
16
16
10A/
250V
3.5A/
250V
–
–
3.5A/
250V
T2SSK7514D
12VDC @ 10A
9.7-
13.2
2.5A
2.5A
Installation Instructions:
Wiring methods shall be in accordance with the National Electrical Code/NFPA 70/ANSI, and with all local codes and authorities having jurisdiction.
Product is intended for indoor use only.
1. Remove backplane from enclosure. Do not discard hardware.
2. Mark and predrill holes in the wall to line up with the top two/three keyholes in the enclosure. Install two/three upper fasteners and
screws in the wall with the screw heads protruding. Place the enclosure’s upper keyholes over the two/three upper screws;
level and secure. Mark the position of the lower three holes. Remove the enclosure. Drill the lower holes and install the three
fasteners. Place the enclosure’s upper keyholes over the two/three upper screws. Install the three lower screws and make sure to
tighten all screws.
3. Mount included UL Listed tamper switch (Altronix Model TS112 or equivalent) in desired
location, opposite hinge. Slide the tamper switch bracket onto the edge of the enclosure
approximately 2” from the right side
(Fig. 1, pg. 2)
. Connect tamper switch wiring to the
Access Control Panel input or the appropriate UL Listed reporting device.
To activate alarm signal open the door of the enclosure.
4. Mount S2-INST Installation Kit to backplane, refer to
pages 3, 4
.
5. Refer to the
ULXB Power Supply/Charger Installation Guide
for AL1012ULXB,
AL1024ULXB2 and corresponding
Sub-Assembly Installation Guides
for ACM8,
PDS8, VR6 and PD8UL for further installation instructions.
Hardware:
Fig. 1
Tamper Switch
(included)
To Access Control Panel or
UL Listed Reporting Device
Edge of
Enclosure
Enclosure
Lock Nut