![Altronix TROVE T2KHK3F12 Installation Manual Download Page 2](http://html1.mh-extra.com/html/altronix/trove-t2khk3f12/trove-t2khk3f12_installation-manual_2913230002.webp)
- 2 -
T2KHK3F12(D) Installation Guide
Overview:
Altronix T2KHK3F12 and T2KHK3F12D Trove Kantech kits are pre-assembled and consist of Trove2KH2 enclosure/backplane with factory installed
Altronix power supply/charger and sub-assemblies. T2KHK3F12 and T2KHK3F12D also accommodate various combinations of Kantech boards for
up to twelve (12) doors in a single enclosure.
TKH2 accommodates a combination of the following Kantech boards:
• Up to four (4) KT-MOD-INP16 or KT-MOD-OUTP16.
• Up to four (4) KT300.
• Up to three (3) KT400.
Configuration Chart:
Altronix
Model Number
Power Supply Board Input Fuse Rating
Power Supply Board Battery Fuse Rating
120VAC 60Hz Input Current (A)
Maximum Supply
Current for Main and
Aux. Outputs on
Power Supply board
and ACM4(CB)/
ACM8(CB) Access Power
Controllers’outputs
Nominal DC Output
Voltage
Fail-Safe/Fail-Secure or Dry Form “C” Outputs
ACM4(CB) Board Input Fuse Rating
ACM4 Board Output Fuse Rating
ACM4CB Board Output PTC Rating
ACM8(CB) Board Input Fuse Rating
ACM8 Board Output Fuse Rating
ACM8CB Board Output PTC Rating
[DC]
[Aux]
Output
Range
(VDC)
Output
Range
(VDC)
T2KHK3F12
5A/
250V
10A/
32V
3.5
24VDC @ 5.4A
20.17-
26.4
20.28-
26.4
12
10A/
32V
3A/
32V
–
10A/
250V
2.5A/
250V
–
T2KHK3F12D
–
2.5A
–
2.5A
Installation Instructions:
Wiring methods shall be in accordance with the National Electrical Code/NFPA 70/ANSI, and with all local codes and authorities having juris-
diction. Product is intended for indoor use only.
1. Remove backplane from enclosure. Do not discard hardware.
2. Mark and predrill holes in the wall to line up with the top three keyholes in the enclosure. Install three upper fasteners
and screws in the wall with the screw heads protruding. Place the enclosure’s upper keyholes over the three upper
screws, level and secure. Mark the position of the lower three holes. Remove the enclosure. Drill the lower holes and
install the three fasteners. Place the enclosure’s upper keyholes over the three upper screws. Install the three lower
screws and make sure to tighten all screws.
3. Mount included UL Listed tamper switch (Altronix Model TS112 or equivalent) in desired location, opposite hinge.
Slide the tamper switch bracket onto the edge of the enclosure approximately 2” from the right side
(Fig. 1, pg. 2)
.
Connect tamper switch wiring to the Access Control Panel input or the appropriate UL Listed reporting device.
To activate alarm signal open the door of the enclosure.
4. Mount Kantech boards to TKH2 backplane, refer to
page 3
.
5. Refer to the
eFlow Power Supply/Charger Installation Guide
for eFlow6NB and corresponding
Sub-Assembly
Installation Guides
for the following models: ACM8(CB), ACM4(CB) and T1618300K for further installation instructions.
Fig. 1
Tamper Switch
(included)
To Access Control Panel or
UL Listed Reporting Device
Edge of
Enclosure
Enclosure