Altronix TROVE T2KHK3F12 Installation Manual Download Page 2

- 2 -  

T2KHK3F12(D) Installation Guide

Overview:

Altronix T2KHK3F12 and T2KHK3F12D Trove Kantech kits are pre-assembled and consist of Trove2KH2 enclosure/backplane with factory installed 

Altronix power supply/charger and sub-assemblies. T2KHK3F12 and T2KHK3F12D also accommodate various combinations of Kantech boards for 

up to twelve (12) doors in a single enclosure.

TKH2 accommodates a combination of the following Kantech boards:

•  Up to four (4) KT-MOD-INP16 or KT-MOD-OUTP16.

•  Up to four (4) KT300.

•  Up to three (3) KT400.

Configuration Chart:

Altronix

Model Number

Power Supply Board Input Fuse Rating

Power Supply Board Battery Fuse Rating

120VAC 60Hz Input Current (A)

Maximum Supply

Current for Main and 

Aux. Outputs on 

Power Supply board 

and ACM4(CB)/

ACM8(CB) Access Power 

Controllers’outputs

Nominal DC Output 

Voltage

Fail-Safe/Fail-Secure  or Dry Form “C”  Outputs

ACM4(CB) Board  Input Fuse Rating

ACM4 Board Output Fuse Rating

ACM4CB Board Output PTC Rating

ACM8(CB) Board  Input Fuse Rating

ACM8 Board Output Fuse Rating

ACM8CB Board Output PTC Rating

[DC]

[Aux]

Output 

Range 

(VDC)

Output 

Range 

(VDC)

T2KHK3F12

5A/

250V

10A/

32V

3.5

24VDC @ 5.4A

20.17-

26.4

20.28-

26.4

12

10A/

32V

3A/

32V

10A/

250V

2.5A/

250V

T2KHK3F12D

2.5A

2.5A

Installation Instructions:

Wiring methods shall be in accordance with the National Electrical Code/NFPA 70/ANSI, and with all local codes and authorities having juris-

diction. Product is intended for indoor use only. 

1.  Remove backplane from enclosure. Do not discard hardware.

2.  Mark and predrill holes in the wall to line up with the top three keyholes in the enclosure. Install three upper fasteners 

 

and screws in the wall with the screw heads protruding. Place the enclosure’s upper keyholes over the three upper 

 

screws, level and secure. Mark the position of the lower three holes. Remove the enclosure. Drill the lower holes and 

 

install the three fasteners. Place the enclosure’s upper keyholes over the three upper screws. Install the three lower 

 

screws and make sure to tighten all screws.

3.  Mount included UL Listed tamper switch (Altronix Model TS112 or equivalent) in desired location, opposite hinge. 

 

Slide the tamper switch bracket onto the edge of the enclosure approximately 2” from the right side 

(Fig. 1, pg. 2)

 

Connect tamper switch wiring to the Access Control Panel input or the appropriate UL Listed reporting device. 

 

To activate alarm signal open the door of the enclosure.

4.  Mount Kantech boards to TKH2 backplane, refer to

 page 3

.

5.  Refer to the 

eFlow Power Supply/Charger Installation Guide

 for eFlow6NB and corresponding 

Sub-Assembly 

 

Installation Guides

 for the following models: ACM8(CB), ACM4(CB) and T1618300K for further installation instructions. 

Fig. 1

Tamper Switch

(included)

To Access Control Panel or

UL Listed Reporting Device

Edge of

Enclosure

Enclosure

Reviews: