
10
5
Frame Assembly
Diagram 10
Diagram 11
Diagram 9
Before fixing this corner make sure the inside
faces are all flush (diagram 9). When you are
happy that the purling is located correctly (it is
normal that the purling is set back slightly
from the glass rebate on the front of the
building) start by inserting the 80mm screw
through the side of the eaves bar into the
tenon on the end of the purling.
Next insert the 100mm screw vertically down
through the roof corner bar into the eaves bar
and finally securing the side corner bar
(diagram 11).
Internal
80m
m Sc
rew
EV
04
81
EV04
14
EV0491
Eaves ba
r
100m
m Screw
100m
m Screw
EV0414
EV
04
81
EV491
External
X-ray