
TESTING PROCEDURE
- Switch ON the LOW amplifier output to 4
Ω
load resistor and repeat the above booster check
verifying more or less the same ± VCC1 conditions and verify that the signal must be
symmetrical refer to GND, without detectable distortion and oscillation.
Increase the VOLUME pot. until a signal clipping.
Switch OFF the LOW amplifier out. to 4
Ω
load resistor
Par. 5: COMPRESSOR check of LOW amplifier
-Increase the input signal of 10 dB and check the out. signal to remain constant at 45V
peak
and
if the Signal/Comp. led has changed the lighted colour, from GREEN to RED.
Par. 6: PTC function check on Heatsink
- Heat the PTC temperature sensor with a welder heated tip, in touch with its body, to verify this
protection works properly reducing the amplifier out. signal to few volts on time.
P.S. The check must be done with PTC, placed into heat-sink hole and silicon grease on.
Par. 7: Idle current setting of LOW amplifier
- Decrease to zero the signal generator, then, adjust VR1 trimmer to have a 3mV ±0,5mVdc
voltage drop across R24 & R26 power resistors.
-
Part .8: Burn-in test
1. Connect the pink noise signal from CD player with the line input of speaker module.
2. Connect 4ohm 500W load resistor with the bass output.
3. Put band switch to the position 1, and then turn on the power switch of speaker module.
4. Adjust the pink noise level from CD player until SIGNAL/LIMIT indicators (red, green) sparkle.
5. Put the speaker module vertical and take the burn-in test for 3 hours.
Part .9: Final inspection
1. Check the electronic performance of the tested unit completely.
Summary of Contents for SR500SA
Page 1: ...Service Manual ALTO REV 2 Model SR500SA...
Page 8: ...04 1...
Page 9: ...04 2...
Page 10: ...04 3...
Page 13: ...05 3...
Page 14: ...06 1...
Page 15: ...06 2...
Page 16: ...06 3...
Page 17: ...07 1...