EKHBH/XE008AA3V3
Indoor unit for air to water heat pump system
4PW48441-1B
Installation manual
3
Scope of this manual
This installation manual describes the procedures for unpacking,
installing and connecting all EKHBH/X indoor unit models.
Model identification
Indoor unit
Drain pan kit (optional)
A
CCESSORIES
Accessories supplied with the indoor unit
See
T
YPICAL
APPLICATION
EXAMPLES
The application examples given below are for illustration purposes
only.
Application 1
Space heating only application with a room thermostat connected to
the indoor unit.
Pump operation and space heating
When a room thermostat (T) is connected to the indoor unit, the
pump (4) will operate when there is a heating request from the room
thermostat, and the outdoor unit will start operating to achieve the
target leaving water temperature as set on the user interface.
When the room temperature is above the thermostat set point, the
outdoor unit and pump will stop operating.
NOTE
Installation of the ERHQ heat pump outdoor is
described in the outdoor unit installation manual.
Operation of the indoor unit is described in the indoor
unit operation manual.
EK
HB
XE
008
AA
3
V3
Backup heater nominal
voltage:
V3 = 1P, 230 V
Backup heater capacity (kW)
Series
Indication of heating/cooling capacity (kW)
(a)
(a) For exact values, refer to
"Technical specifications" on page 26
.
XE = heating and cooling,
HE = heating only
Hydro box
European kit
EK
HB
DP
150
Drain pan
Hydro box
European kit
1
Installation manual
2
Operation manual
3
Unpacking instruction sheet
4
Shut-off valve
5
Wall mounting bracket
6
Wiring diagram sticker (inside indoor unit cover)
7
Indoor unit cover fixing screw
8
Nylon washer
When the
AD
system is used in series
with another heat source (e.g. gas boiler), it shall be made
sure that the return water temperature to the heat
exchanger does not exceed 55°C. Daikin shall not be held
liable for any damage resulting from not observing this rule.
1
Outdoor unit
6
Collector (field supply)
2
Indoor unit
7
Shut-off valve
3
Heat exchanger
FHL1..3
Floor heating loop
(field supply)
4
Pump
5
Shut-off valve
T
Room thermostat
(field supply)
Make sure to connect the thermostat wires to the correct
terminals (see
"Connection of the thermostat cable" on
) and to configure the DIP switch toggle switches
"Room thermostat installation configuration"
FHL1
FHL2
FHL3
T
5
6
4
3
2
1
7
Summary of Contents for EKHBHE008AA3V3
Page 29: ...NOTES NOTES ...
Page 30: ...4PW48441 1B Copyright Daikin ...