115
NO
DK
FI
SE
FR
GB
GB
allow the modification of the pump lead and follow-up times, setback tempera-
tures, time intervals and many other parameters.
Information on the configuration possibilities can be found in the Altech
V3 IP Base station instructions.
6.1.10 Connection test
During this verification the room control unit Display sends a switching command
to the base station. Depending on the switching status the assigned heating zone
has, it will be switched on or off after receiving the command.
1. Press and hold the setting wheel (E) in order to open the configuration menu.
2. Select the symbol “ “ and confirm the selection by shortly pressing the setting
wheel.
7 Operation
The setting wheel (see position E in fig. 1) provides the operating functions of the
room control unit. The settings are transmitted to connected radiator thermostats
as well as to the IP app, and displayed there.
• Temperature:
Turn the setting wheel to the right or to the left in order to change
the temperature. In automatic operation, the set temperature remains until the
next switch-over point is reached. After that, the set heating profile will be re-ac-
tivated. In manual operation, the temperature remains until the next manual
change is made.
Summary of Contents for 04 6125.050
Page 3: ...3 NO DK FI SE FR GB 1x 1x 2x 2x 2x 2x M3 x 30 mm 5 mm...
Page 5: ...5 NO DK FI SE FR GB 150 cm 30 cm...
Page 6: ...6 NO DK FI SE FR GB 2a 2b 2c 1 B C D E A...
Page 7: ...7 NO DK FI SE FR GB 3 4...
Page 122: ......
Page 123: ......
Page 124: ...124 NO DK FI SE FR GB 132809 1622...