AltaRacks ALTA QUATTRO GPR Manual Download Page 2

ALTA SIX / quattro 
GPR 2.0

Tool list for assembling the rack

All tools are SAE US standard tools
1. 15/16 inch (quantity of two)
2. 9/16 wrench or rachet (two)
3. 7/16 wrench for set screw jam

nuts

4. 5/32 Allen key is included with
your rack

OR

Two crescent wrenches

Thank you for purchasing our products, we proudly build our racks in Utah USA. 
Designed using military grade product development methods, and rigorously tested the 
ALTA SIX GPR and the ALTA QUATTRO GPR are build to last. Please join us on social media 
and YouTube for latest updates. We never spam. Please directly contact us if you have 
any issues with your product

[email protected]

Summary of Contents for ALTA QUATTRO GPR

Page 1: ...Hello Operator ALTA GPR installation and user manual...

Page 2: ...th your rack OR Two crescent wrenches Thank you for purchasing our products we proudly build our racks in Utah USA Designed using military grade product development methods and rigorously tested the A...

Page 3: ...atch is installed on the vertical beam opposite side of the ALTA RACKS sticker close to the bottom pivot Look for three holes 1 on the side of beam The latch is installed on the outside hole Using a 9...

Page 4: ...of the interior plate and align with holes on the receiver hitch 1 2 3 Install the 5 8 bolt wit h washer on one side and washer and lock washer with nut on the other side 3 Using two 15 16 wrench or...

Page 5: ...mounting holes are oval in shape this is to allow for forward and back movement to adjust the tension Once the desired tension is achieved tighten the two bolts 2 until the latch assembly is secure Us...

Page 6: ...eam The bolt with rubber housing is installed where the nut is welded on the receiver hitch To lower the rack remove the orange pin and dis engage the latch The rubber housing will protect the main be...

Page 7: ...e nuts pointing up Insert assembled section in to your vehicle hitch 2 Align the anti sway unit as shown 3 Using a inch driver or wrench or crescent wrench Gorilla tighten the anti sway 4 Gorilla tigh...

Page 8: ...The mounting bracket points down 2 Secure the 3 8 bolts nuts and washers and tighten until there is no movement in the bar 3 There are three positions available for top bar assembly middle position wi...

Page 9: ...1 The bar will be on the lower portion of the bracket 2 Tighten single bolt There may be a little play in this bar The lower bar is not a structural bar and is design to bend on impact DO NOT TIE DOWN...

Page 10: ...es apart Separation is based on bike size and fit Baskets lean to the left load bike from right to left Slide the bottom sliders on to the bottom horizontal bar for shorter wheelbase bikes point strap...

Page 11: ...s cluster bikes around the center beam if you are not carrying six bikes For five bikes best balance start from right an load left skip the basket from last on the left and use the last basket on the...

Reviews: