
10
Altai C2s Dual-Band 2x2 802.11ac WiFi AP/Bridge
Installation Guide
Altai Technologies Ltd. All rights reserved
4.
Wrap the C2s unit with a layer of electrical tape. Start from 1cm
above the rubber tape wrapping. Wrap a loop and overlap a half.
Continue until the electrical tape totally covers the rubber tape
including the cable section.
5.
Typical pole-mount setup with finished wrapping is shown below.
Apply the electrical
tape on the C2s
down to the cable.