background image

Via Dante #70787 

Floormount tub filler with handshower / robinet de bain au sol avec douchette

 

alt-aqua.com

INSTALLATION

1. 

Prepare the floor

Préparer le plancher 

Mark and drill four mounting holes over the floor. (Fig. 1)

       

Respect your centering.

Marquer et percer quatre trous de montage. (Fig. 1)

Bien centrer la base sur les alimentations.

Minimiz

e

the C-

C

Fig.2

2.

Asymmetrical hose adaptors
Adaptateurs asymétriques

Separate the adaptors from the hoses by unscrewing the nut (4) 

(fig.3) while pulling-out at the same time (until the thread is engaged).
Referring to fig.3, install the asymmetrical hose adaptors to the supply-

pipes inlets. Be aware that you can also use 8mm (5/16”) allen keys 
to thread the adapters in place.For a 
trouble-free installation bring the 2 hoses adapters as close from one 
another as possible. The max C-C which can be 

accommodated is 23mm.

Séparer les adaptateurs des alimentations flexibles en dévissant leurs 
écrous (4) (fig. 3), tout en exerçant une traction (jusqu’à ce que le pas 
de vis soit engagé). Se référant à la fig.3, installer les adaptateurs asy

-

métriques sur les arrivées d’eau chaude et froide. Vous pouvez aussi 

utiliser une clé Allen 8mm (5/16”) pour fixer les adaptateurs en place 

pour une meilleure installation Positionner les deux adaptateurs pour 
qu’ils soient aussi proche que possible. Le C-C maxinum qui peut être 

accepté est 23mm.

8mm (5/16”)

Fig.1

Summary of Contents for VIA DANTE 70787

Page 1: ...VIA DANTE 70787 floormount tub filler with handshower robinet de bain au sol avec douchette Installation care guide Guide d installation et d entretien last revision 17 12 2021...

Page 2: ...ding Alt products please contact AD WATERS exclusive distributor of ALT products across North America Canada and USA www ad waters com www alt aqua com F licitations pour l achat de votre produit Alt...

Page 3: ...BCA56084 Cartridge Cartouche 4 ALT7 707 69 00 Diverter assembly D viateur 5 ALT7 707 54 01 Handshower Douchette 6 ALT7 707 68 01 Diverter knob Bouchon du d viateur 7 ALT7 707 20 01 Aerator A rateur 8...

Page 4: ...for a minimum C C between hot cold inlets see examples The orientation of the pair of supply connections is independent from the final spout position Optimiser la configuration du brut pour minimiser...

Page 5: ...OPERLY FLUSH THE HOT AND COLD WATER SUPPLY LINES PRIOR TO STARTING INSTALLATION MISE EN GARDE POUR OBTENIR UN R SULTAT OPTIMAL NOUS RECOMMANDONS FORTEMENT QUE L INSTALLATION DE CE ROBINET SOIT FAITE P...

Page 6: ...al hose adaptors to the supply pipes inlets Be aware that you can also use 8mm 5 16 allen keys to thread the adapters in place For a trouble free installation bring the 2 hoses adapters as close from...

Page 7: ...out is properly lined up adjust as required using the 4 set screws 6 at the base of the pedestal Lower the decorative flange 7 to the floor Enfoncer compl tement les embouts des alimentations flexible...

Page 8: ...s pi ces nettoy es replacer l a rateur Cartridge replacement Remplacement de la cartouche Start by shutting off water supply lines and then turn on the faucet handle to drain the water To replace the...

Page 9: ...retien sur une base r guli re Ne jamais utiliser de produits abrasifs ou corrosifs incluant de tr s forts d tergents sur votre produit ALT Cela pourrait d t riorer le fini et annuler la garantie To cl...

Page 10: ...e warranty against defects All other Alt finishes are warranted for three 3 years Finishes on drains are not covered by the warranty nor the normal wear of any finish Normal wear and tear is the expec...

Page 11: ...les drains et l usure normale d un fini ne sont pas couverts par cette garantie L usure normale est la d t rioration naturelle d un produit r sultant de son utilisation au fil du temps Il est fortemen...

Reviews: