background image

Stocco 3000

www.alseautomation.com

0.3

STOCCO 5000 

 USER MANUAL

4.  Install the external cabinet (picture h),4x M6x12 (plus gasket)

5.  Install the switch baffle (picture i), and adjust the opening and closing amplitude to the right place.
6.  Add the appropriate amount of lithium grease on the gears and racks. (butter)
7.  When you finally install the electrical part, please check again. Is all the parts are fastened and is there anything on the slide door track.
8.  Must ensure the safety of debugging personnel before the test machine!

VII.  Wiring (See picture)

Stocco 5000

Accessories list for the LS series

Name  

Specifications 

Quantity 

Unit  

Remarks

Short baffle  

 

1  

piece  

Standard

Long baffle  

 

1  

piece  

Standard

Inner hexagon screw 

M6X10  

4  

piece  

Standard

Wrench  

M10 Allen wrench 

 

piece  

Standard

Rack block  

14X22X80  

Meters X2+1 

piece  

Quantity match with the rack length from the door

Control box  

 

1  

piece  

Optional

Rack  

6M 30X30X1000mm 

A few meters 

Meter Optional

Reviews: