HYC_50 Installation and commissioning
All rights reserved. Reproduction of this document, in whole or in part, is only permitted with the permission of alpitronic GmbH.
Table 5:
Load Table for Fischer dowels/anchors
4.1.5. Mounting the HYC_50
4.1.5.1.
Mounting preparation
Before mounting the connection cable, the strain relief suitable for the cable diameter should
be selected and the cable gland should be cut off at the corresponding point of the sealing
cone so that both parts can achieve their optimum functionality. The matching cable
diameters are stamped on the strain reliefs so that there is no risk of confusion.
Figure 16:
Cable gland