(4) Adjustment Procedures
Step
Description
Connection
Signal Generator
Dial Control
Test Point /
P.W.Board
Coordinates
Adjustment
1
Signal Meter
Auto
Adjustment
(FM)
Figure 3
(1)
87.5MHz ,
26dBµ
(Mod. OFF)
87.5MHz
TP002
(3-F)
TP608
(5-D)
Auto Adjustment :
After setting up of Signal Genarator,
short GND and TP608 (Pull-Down)
for 1 seconds.
(2)
87.5MHz ,
26dBµ
(Mod. OFF)
87.5MHz
TP002
(3-F)
TP608
(5-D)
Proceed same Auto Adjustment of step
(1) under step (2).
(SPEC) TP002 : 1.5±0.1V
OK
(SPEC) TP002 : others 1.5±0.1V
NG
NOTE : NG : Proceed same Auto
Adjustment of step (1)
under step (3).
(3)
87.5MHz ,
21~23dBµ
(Mod. OFF)
87.5MHz
TP002
(3-F)
TP608
(5-D)
Proceed same Auto Adjustment of step
(1) under step (3).
(4)
87.5MHz ,
26dBµ
(Mod. OFF)
87.5MHz
TP002
(3-F)
TP608
(5-D)
Proceed same Auto Adjustment of step
(1) under step (4).
2
Signal Meter
Auto
Adjustment
(#1 MW)
($1 AM)
Figure 4
(1)
999kHz ,
34dBµ
(Mod. OFF)
999kHz
TP002
(3-F)
TP608
(5-D)
Auto Adjustment :
After setting up of Signal Genarator,
short GND and TP608 (Pull-Down)
for 1 seconds.
(2)
999kHz ,
34dBµ
(Mod. OFF)
999kHz
TP002
(3-F)
TP608
(5-D)
Proceed same Auto Adjustment of step
(1) under step (2).
(SPEC) TP002 : 1.0±0.1V
OK
(SPEC) TP002 : others 1.0±0.1V
NG
NOTE : NG : Proceed same Auto
Adjustment of step (1)
under step (3).
(3)
999kHz ,
29~31dBµ
(Mod. OFF)
999kHz
TP002
(3-F)
TP608
(5-D)
Proceed same Auto Adjustment of step
(1) under step (3).
(4)
999kHz ,
34dBµ
(Mod. OFF)
999kHz
TP002
(3-F)
TP608
(5-D)
Proceed same Auto Adjustment of step
(1) under step (4).
NOTE: #1 : For European Model Only, $1 : For General Foreign Model Only, Others : Common.
TO CONTENTS